Laserfiche WebLink
BID SUMMARY <br />2019.0050 <br />19-20.005 <br />BID OPENING DeSilva Gates Construction LP A. Teichert & Son Inc. dba Teichert ConGranite Construction Company <br />DATE: Wednesday, May 20, 2020 11555 Dublin Boulevard 5200- Franklin Drive, Suite 115 715 Comstock Street <br />TIME: 3:30 PM Dublin, CA 94568 Pleasanton, CA 94588 Santa Clara, CA 95054 <br />LOCATION: City Clerk's Office Phone: (925) 829-9220 Phone: (925) 621-5700 Phone: (408) 327-7000 <br />Fax: (925) 803-4263 Fax: (925) 621-5799 Fax: (408) 327-7090 <br />ITEM <br />NO.ITEM <br />SPECIAL <br />PROVISIONS <br />SECTION UNIT COST ITEM COST UNIT COST UNIT COST UNIT COSTQUANTITYITEM COST ITEM COST <br />Annual Street Overlay/Rehabilitation 2018-20 <br />Prepared by: Claire O'Brien <br />Date Approved: 5/21/20 <br />PROJECT TITLE: <br />PROJECT NO.: <br />BID NO.: <br />ENGINEER'S ESTIMATE <br />ITEM COST <br />302 WHEEL CHAIR CURB CUT RAMP <br />(TYPE 'B') <br />303-5 690 SF $27.50 $18,975.00 $20.00 $13,800.00 $25.00 $17,250.00 $25.00 $17,250.00 <br />303 WHEEL CHAIR CURB CUT RAMP <br />(TYPE 'C') <br />303-5 8,335 SF $27.50 $229,212.50 $20.00 $166,700.00 $25.00 $208,375.00 $21.00 $175,035.00 <br />304 WHEEL CHAIR CURB CUT RAMP <br />(TYPE 'D') <br />303-5 240 SF $27.50 $6,600.00 $30.00 $7,200.00 $25.00 $6,000.00 $32.00 $7,680.00 <br />305 CONCRETE SIDEWALK 303-5 6,370 SF $11.00 $70,070.00 $15.00 $95,550.00 $20.00 $127,400.00 $14.50 $92,365.00 <br />306 CONCRETE DRIVEWAY 8”303-5 615 SF $22.00 $13,530.00 $20.00 $12,300.00 $35.00 $21,525.00 $18.00 $11,070.00 <br />307 REMOVE AND REPLACE <br />CONCRETE DRIVEWAY 6” <br />(REVOCABLE) <br />303-5, 300-1 15 EA $4,400.00 $66,000.00 $2,000.00 $30,000.00 $3,500.00 $52,500.00 $8,200.00 $123,000.00 <br />308 SEGMENTED CURB AND GUTTER 303-5 140 LF $49.50 $6,930.00 $90.00 $12,600.00 $100.00 $14,000.00 $88.00 $12,320.00 <br />309 CONCRETE VALLEY GUTTER 303-5 57 SF $110.00 $6,270.00 $20.00 $1,140.00 $90.00 $5,130.00 $25.00 $1,425.00 <br />310 CONCRETE VERTICAL CURB 303-5 162 LF $44.00 $7,128.00 $60.00 $9,720.00 $75.00 $12,150.00 $63.00 $10,206.00 <br />311 CONCRETE CHANNEL/ TRENCH <br />DRAIN <br />303-5 150 LF $55.00 $8,250.00 $400.00 $60,000.00 $380.00 $57,000.00 $348.00 $52,200.00 <br />400 FULL DEPTH RECLAMATION (FDR)301-3.4 289400 SF $1.38 $397,925.00 $0.30 $86,820.00 $0.70 $202,580.00 $0.53 $153,382.00 <br />401 COMPACTION AND FINAL GRADING 301-3.4 289400 SF $1.65 $477,510.00 $0.60 $173,640.00 $0.70 $202,580.00 $0.83 $240,202.00 <br />402 CEMENT SPREADING - FDR 301-3.4 650 TON $220.00 $143,000.00 $175.00 $113,750.00 $175.00 $113,750.00 $168.00 $109,200.00 <br />403 HOT MIX ASPHALT (HMA) - 2.5"302-5 170 TON $148.50 $25,245.00 $100.00 $17,000.00 $150.00 $25,500.00 $250.00 $42,500.00 <br />404 HOT MIX ASPHALT (HMA) - 3"302-5 3680 TON $148.50 $546,480.00 $100.00 $368,000.00 $120.00 $441,600.00 $160.00 $588,800.00 <br />405 HOT MIX ASPHALT (HMA) - 3.5"302-5 890 TON $148.50 $132,165.00 $100.00 $89,000.00 $120.00 $106,800.00 $130.00 $115,700.00 <br />406 HOT MIX ASPHALT (HMA) - 4"302-5 1720 TON $148.50 $255,420.00 $100.00 $172,000.00 $120.00 $206,400.00 $145.00 $249,400.00 <br />407 HOT MIX ASPHALT (HMA) - 5"302-5 6680 TON $148.50 $991,980.00 $100.00 $668,000.00 $120.00 $801,600.00 $137.00 $915,160.00 <br />408 HOT MIX ASPHALT (HMA) - 5.5"302-5 3120 TON $148.50 $463,320.00 $100.00 $312,000.00 $120.00 $374,400.00 $127.00 $396,240.00 <br />409 HOT MIX ASPHALT (HMA) - 6"302-5 2340 TON $148.50 $347,490.00 $100.00 $234,000.00 $120.00 $280,800.00 $138.00 $322,920.00 <br />410 HOT MIX ASPHALT (HMA) - 7"302-5 7220 TON $148.50 $1,072,170.00 $100.00 $722,000.00 $120.00 $866,400.00 $135.00 $974,700.00 <br />411 PAVEMENT TIE IN 302-5 155 TON $2,227.50 $345,262.50 $100.00 $15,500.00 $300.00 $46,500.00 $286.00 $44,330.00 <br />412 SPEED LUMP 316 8 EA $2,475.00 $19,800.00 $3,000.00 $24,000.00 $5,000.00 $40,000.00 $6,650.00 $53,200.00 <br />500 REMOVE AND RESET (STORM <br />DRAIN/SEWER MANHOLE) <br />301-1.6.1 28 EA $990.00 $27,720.00 $3,000.00 $84,000.00 $2,000.00 $56,000.00 $3,200.00 $89,600.00 <br />Copy of Annual Street Overlay Rehab 2018-20 - Bid Summary Page 2 of 7 Printed 5/28/2020 @ 11:23 AM78