My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2020-072 CSA Denalect Alarms for Farrelly Pool
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2020
>
Reso 2020-072 CSA Denalect Alarms for Farrelly Pool
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2020 11:47:00 AM
Creation date
7/9/2020 3:31:22 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
7/6/2020
Retention
PERM
Document Relationships
8D Consent 2020 0706
(Approved by)
Path:
\City Clerk\City Council\Agenda Packets\2020\Packet 2020 0706
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Work in concert with the City's general contractor for the pool replacement project for <br />installation of necessary conduit. <br />■ Contract includes schedule of equipment as listed below, and includes freight, labor, <br />taxes, wiring, fasteners, and installation and connection of equipment below. <br />• Revise all its City related programming and software as needed to accommodate the <br />scope of work as described below. <br />• Complete final system testing and instruct owners on the operation of system. <br />• One (I ) year warranty parts and labor on new equipment installed by Denalect. <br />6.0 City Furnished Items <br />City's Pool Contractor shall provide: <br />• All conduits from each beam detector back to the alarm panel location in the storage <br />closet 108. (Denalect will rain the wire from a conduit junction box provided by <br />electrical by alarm panel.) <br />• Dedicated 20amp circuit at the fire alarm panel location to be provided by C ity's General <br />Contractor. Provide AC power at the burglar alarm control panel location. <br />• All door locking hardware and gate locking hardware including powering the locks <br />• Mounting and installation of poles for perimeter beam. Power supply and all wiring from <br />each beam in conduit supplied and installed by others back to the alarm panel. <br />The City shal I provide the necessary information regarding users, access times and what doors <br />City staff will have access too. <br />7.0 Exclusions: <br />The following items are not included in the scope of work for this contract: <br />• Access doors, panels or hatches <br />■ Roof Penetrations <br />■ Fire proofing <br />• Concrete work <br />■ Scissor lift (if needed) to be supplied by Electrical Contractor for Denalect Alarms use <br />• Building and electrical pen -nit Fees if required. <br />• Paint. patching, acoustical ceiling tiles, or any other typical finish work. <br />• Engineering or redesign <br />• Explosion proof devices, boxes, enclosures, terminal cabinets or any type of Nema cans <br />■ All Conduits above ground and or underground. Wire mold, all back boxes, T -Bar <br />supports, weather proof back boxes, weather proof terminal cabinets & gutters with pull <br />strings supplied, marked and installed by others <br />■ Underground trenching <br />■ Special insurance, bonds, permits, fees, premium time and overtime. <br />Consulting Services Agreement between City of San Leandro and August 12, 2419 <br />Denalect Alarm Company for the Farrelly Pool Replacement Exhibit A — Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.