Laserfiche WebLink
DocuSign Envelope ID: 327D2FAD-AC66-44F3-941A-4F9F8BF98F85 <br />- As -built sequence of operations (as provided by the Contractor), control drawings (as provided by <br />the Contractor) and original setpoints established during commissioning <br />- Test and Balance (TAB) reports (as provided by the mechanical system balancing contractor) <br />- Operating information for integrated building systems, including designed capabilities, limitations, <br />usage instructions, and location (0&M manuals). <br />- Recommended schedule of maintenance requirements and frequency <br />- Recommended schedule for retesting of commissioned systems with blank test forms from the <br />original Commissioning Plan <br />Deliverables: <br />- Commissioning plan <br />- Pre -functional checklists <br />- Draft and executed functional performance tests <br />- Final commissioning report <br />- Systems manual <br />City to Provide: <br />- Design drawings and specifications for each phase of the design and addendum/amendments after <br />the design phase is complete. <br />- Sequences of operation for HVAC and lighting control systems <br />- Construction submittal documents of commissioned equipment, including equipment submittals, <br />0&M submittals, TAB report, and training submittals (if applicable) <br />- Access to the site for commissioning and inspection activities during construction and after <br />construction is complete <br />- Direction to contractors for their participation in the commissioning process and pre -functional <br />checklist completion and functional performance testing <br />- Access to the building automation system (BAS) for remote trend analysis and troubleshooting of <br />the system, as required <br />- Trend data from the BAS, as required <br />Exclusions: <br />- No plumbing or irrigation equipment is included within commissioning scope. <br />- Consultant will not provide commissioning specifications, but adhere to existing project <br />specifications. <br />- Inclusion of the Title 24 Design Review forms in the permit set. <br />- Retesting for systems that fail initial testing or are not ready at the agreed-upon date. Repeat <br />testing for these systems will require additional visits to be billed on a time and materials basis. <br />- Submittal of Certificates of Acceptance to inspector and City <br />- Review of owner's project requirements (OPR) and Basis of Design (BOD) <br />- Title 24 Documentation for design review <br />- Title 24 Acceptance Testing without City approval <br />Consulting Services Agreement between City of San Leandro and May 12, 2020 <br />kW Engineering for Police Bldg & So. Office Modifications Exhibit A — Page 2 of 2 <br />