My WebLink
|
Help
|
About
|
Sign Out
Home
Management Agreement American Golf Corp Monarch Bay
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2020
>
Management Agreement American Golf Corp Monarch Bay
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2025 7:35:00 PM
Creation date
7/29/2020 1:19:52 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/1/2020
Retention
Perm
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 3C2D3BBB-9622-434A-9243-AF02B243E3A3 <br />1.3.3 Equipment and Methods: Spray equipment shall be in good <br />operating condition, quality, and design to efficiently apply <br />material to the target area. Drift will be minimized by avoiding <br />high pressure applications and using water soluble drift agents. <br />1.3.4 Applications: All pesticide applications shall be in accordance <br />with written recommendations provided by a licensed pest <br />control advisor (PCA) with application performed by a licensed <br />qualified applicator (QAC). All chemical applications are to be <br />pre -approved and reviewed with the Golf Course Operations <br />Manager prior to application. Records of such recommendations <br />and application records shall be available to the Golf Course <br />Operations Manager for inspection at all times. <br />1.3.5 Selection of Materials: Pesticides shall be selected from those <br />materials which characteristically have the lowest residual <br />persistence. Use of emulsifiable concentrates shall be used when <br />possible to limit windblown particles. The use of adjuvants will <br />be utilized to increase pesticide efficiency thereby reducing the <br />total amount of technical material required to gain control. <br />1.4 SOUND CONTROL REQUIREMENTS: The Operator shall comply <br />with all local sound control and noise level rules, regulations, and <br />ordinances which apply to any work performed pursuant to the <br />agreement. Each internal combustion engine used for any purpose on <br />the job or related to the job shall be equipped with a muffler of a type <br />recommended by the manufacturer of such equipment. No internal <br />Exhibit E — Maintenance Standards June 1, 2020 <br />City of San Leandro and American Golf Corporation Page 4 of 45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.