My WebLink
|
Help
|
About
|
Sign Out
Home
Invengo Technology Corp_CSA_August 27, 2020.docx
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2020
>
Invengo Technology Corp_CSA_August 27, 2020.docx
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 11:09:04 AM
Creation date
9/22/2020 1:17:30 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
8/26/2020
Retention
PERM
Document Relationships
Reso 2020-096 CSA Invengo Technology Corp for New RFID at Library
(Approved)
Path:
\City Clerk\City Council\Resolutions\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and Last revised [8.27.2020] <br />Invengo Technology Corp for a Library RFID System Exhibit A – Page 1 of 9 <br />EXHIBIT A <br /> <br />SCOPE OF SERVICES <br /> <br />RFID Conversion Service <br /> <br />Invengo Technology Corp will completely project manage the outsourced staffing, equipment, <br />and supplies necessary to convert the San Leandro Public Library’s existing collection at its 4 <br />(four) locations from EM security strips to RFID tags. The Invengo Technology Corp’s Project <br />Manager will manage the conversion project. Invengo Technology Corp will provide the <br />following equipment and supplies: <br /> <br />RFID Tags <br /> 330,000 RFID Book Tags <br /> 57,000 RFID AV Tags <br /> 50 RFID “Other” Tags for equipment <br /> <br />Mobile Retrospective Encoders <br /> 4 (four) Mobile Retrospective Encoders rented during the 3-month conversion process. <br /> <br />Invengo Technology Corp will manage all aspects of the outsourced staffing for the RFID <br />conversion service, including hiring, training, scheduling (in coordination with Library staff), <br />supervising, and quality control of the work product. The San Leandro Public Library will <br />provide the Invengo Technology Corp’s Project Manager with a pre-tagging checklist and an <br />item file to load onto the Mobile Retrospective Encoders ready for the conversion. The Invengo <br />Technology Corp RFID Conversion Project Manager will provide the San Leandro Public <br />Library a tagging and conversion plan covering the 4 (four) library facilities including the hours, <br />days, and dates when the conversation will occur at least 60 days prior to the start of the <br />conversion process. The conversion plan will include weekly quality control checks on the <br />conversion work product. The tagging and conversion process will require up to 90 days. <br /> <br />Hardware Specifications <br /> <br />The Invengo Technology Corp Installation Team (i.e., Technical Support Officers) is responsible <br />for installing and commissioning the RFID equipment on site. <br /> <br />Staff Workstations, “Circulation Assistants” <br /> All Circulation Assistants will be the “Shielded Standard Kit”, a high-powered, shielded <br />device for multiple item processing in as small area at either Circulation/Service Desks or <br />at a Technical Services/Circulation Staff Workstation. <br />o Main Library <br /> 2 (two) at the Main Library Circulation Desk <br /> 6 (six) at the Main Library, various Technical Processing locations <br />o Manor Branch Library <br />DocuSign Envelope ID: 8FF7EC42-DB1C-4919-AAA5-730971DF2BF2
The URL can be used to link to this page
Your browser does not support the video tag.