My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2020-125 Verizon Wireless Master Agreement Small Cell Pole
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2020
>
Reso 2020-125 Verizon Wireless Master Agreement Small Cell Pole
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 3:56:54 PM
Creation date
10/8/2020 3:43:01 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
9/28/2020
Retention
PERM
Document Relationships
8E Consent 2020 0928
(Approved by)
Path:
\City Clerk\City Council\Agenda Packets\2020\Packet 2020 0928
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Approved Plans and all applicable Laws. Licensee also shall bear all costs of obtaining all <br />Regulatory Approvals required in connection with the installation, and Licensee shall satisfy any <br />conditions or mitigation measures arising from Licensee's proposed installation. Licensee shall <br />timely pay for all labor, materials, and Equipment and all professional services related to the <br />Permitted Use. <br />7.5 No Alteration of City's Existing Equipment or Infrastructure. <br />Neither Licensee nor its Agents or Invitees shall rGtremove, damage, or alter in any way <br />any City Property, including City Poles and supporting infrastructure, pull boxes, electrical <br />equipment, wiring, and electrical vaults, without the express permission of the Engineering and <br />Transportation Director, except as authorized by the Approved Plans. <br />7.6 Standard of Work. <br />Licensee must install and perform all other work on Equipment in strict compliance with <br />Approved Plans and applicable City standards diligently and in a skillful and workmanlike <br />manner. Prior to performing any work that requires excavation, Licensee must notify <br />Underground Service Alert (ph. 800-227-2600 or 811) at least 72-hours in advance so existing <br />buried utilities can be located and marked. After performing any work on the License Area, <br />Licensee shall leave it and other City Property in a condition as good as it was before the work. <br />7.7 Licensee's Contractors <br />Licensee shall use only qualified and properly trained persons and appropriately licensed <br />contractors for all work performed on or about the License Area in conformance with Section <br />13.2 (Personnel Safety Training). At least five (5) business days before to any work commences <br />on or about the License Area, Licensee shall provide the City with: (1) a schedule with all <br />activities to be performed in connection with the work; and (2) a list with all the names, <br />contractor's license numbers, contact information, and business addresses for all contractors <br />who will perform the work. <br />7.8 Project Manager. <br />The City and Licensee each has designated the person listed in the Basic License <br />Information as its project manager to coordinate the design and installation of Licensee's <br />Equipment and to serve as the respective primary point of contact between the City and <br />Licensee for all engineering, construction, and installation issues. Licensee acknowledges that <br />the City project manager is not exclusively assigned to this Master License, and the authority <br />delegated to the project manager is limited to the administration of this Master License, Pole <br />Licenses, and approved Encroachment Permits. Licensee shall be fully responsible for obtaining <br />and satisfying the requirements of all required Regulatory Approvals necessary for installation of <br />Equipment on the License Area, and Licensee shall not rely upon the City or the City's project <br />manager to do so. Either party may change the name and contact information of its project <br />manager by providing written notice thereof in the manner provided in this Master License. <br />Licensee shall be the City's point of contact for all Equipment installation and except in case of <br />emergency, all communications concerning all engineering, construction, and installation issues <br />relating to the Equipment. The City may contact Licensee's Project manager for purposes of <br />responding to technical questions asked by citizens and beyond the expertise of City staff. <br />7.9 Coordination of Work. <br />Licensee shall be responsible for coordination of its installation work to avoid any <br />interference with existing utilities, substructures, facilities, street light operations, or routine <br />maintenance. During installation, alteration, repair, and maintenance of Equipment, Licensee <br />must abide by all City construction regulations, including, but not limited to construction hours, <br />waste management, noise abatement, and traffic management ordinances and regulations. <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.