Description Current Fee Reference Proposed Fee Explanation
<br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division
<br />1 Plans and Specifications See Engineering & Transportation Department Item 7, Public Work Projects
<br />2 Building Permit Fees
<br />A. Filing and Issuance Fee
<br />Re-filing Fee for each resubmittal, deferred submittal, and/or revision after 1st resubmittal, or upon 2nd
<br />resubmittal for plan check on same project
<br />50% of Filing and Issuance Fee per occurrence
<br />B. Permit Fee
<br />Note: The Building Official may adjust the plan checking/permit fee for an individual project when costs to the
<br />City are not congruent with this fee schedule.
<br />i) New Buildings, Additions, Tenant Improvements, Residential Remodels, and Combined Mechanical, Electrical
<br />and/or Plumbing Permits
<br />$1 to $5,000 $197
<br />$5,001 to $10,000
<br />$10,001 to $50,000
<br />$50,001 to $100,000
<br />$100,001 to $500,000
<br />$500,001 to $1,000,000
<br />$1,000,001 and up
<br />ii) Stand-Alone Plumbing Permit
<br />Up to $2,000 $99
<br />$2,001 to $5,000 $197
<br />$5,001 to $10,000
<br />$10,001 and up
<br />iii) Stand-Alone Electrical Permit
<br />Up to $2,000 $99
<br />$2,001 to $5,000 $197
<br />$5,001 to $10,000
<br />$10,001 and up
<br />$128 plus valuation fees and/or other building fees as listed below
<br />$9,460 for the first $1,000,000 plus $4.49 for each additional $1,000 or fraction thereof over $1,000,000
<br />$197 for the first $5,000 plus $39.42 for each add'l $1,000 or fraction thereof, to and including $10,000
<br />$394 for the first $10,000 plus $13.14 for each additional $1,000 or fraction thereof over $10,000
<br />$197 for the first $5,000 plus $39.42 for each add'l $1,000 or fraction thereof, to and including $10,000
<br />$197 for the first $5,000 plus $59.13 for each add'l $1,000 or fraction thereof, to and including $10,000
<br />$493 for the first $10,000 plus $17.25 for each add'l $1,000 or fraction thereof, to and including $50,000
<br />$1,183 for the first $50,000 plus $15.77 for each add'l $1,000 or fraction thereof, to and including $100,000
<br />$1,971 for the first $100,000 plus $12.81 for each add'l $1,000 or fraction thereof, to and including $500,000
<br />$7,096 for the first $500,000 plus $4.73 for each add'l $1,000 or fraction thereof, to and including $1,000,000
<br />Determination of Valuation for Fee-Setting Purposes: Valuation shall be based on total value of all construction work, as determined by the Building Official, including all finish work, roofing, electrical, plumbing, heating, air
<br />conditioning, elevators, fire-extinguishing systems and any other permanent equipment).
<br />For new construction project valuations which the Building Official believes are understated at submittal, valuation may be determined using the most current International Code Council (ICC) valuation table modified to account for a
<br />regional construction cost modifier of 16% or the most currently available regional construction cost modifier (i.e. construction value in ICC Table * 1.16).
<br />For tenant improvement, residential remodels, or other projects that do not involve new square footage project valuations which the Building Official believes are understated at submittal, valuation may be determined using, up to
<br />50% of, the most current International Code Council (ICC) valuation table modified to account for a regional construction cost modifier of 16% or the most currently available regional construction cost modifier (i.e. up to 50% of
<br />construction value in ICC Table * 1.16).
<br />$394 for the first $10,000 plus $13.14 for each additional $1,000 or fraction thereof over $10,000
<br />21
|