My WebLink
|
Help
|
About
|
Sign Out
Home
10B Action 2021 0104
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2021
>
Packet 2021 0104
>
10B Action 2021 0104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 5:43:30 PM
Creation date
12/30/2020 5:41:50 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
1/4/2021
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 9 <br />Complete Streets Evaluation – Hesperian Blvd November 9, 2018 <br />Cumulative Plus Project Conditions Operational Analysis <br />DKS revised the roadway geometry in the Synchro models to test the effect of the lane <br />reduction. Figure 5 illustrates the roadway and intersection geometry for the plus project <br />conditions. As shown in Table 7, delay and LOS would remain within acceptable limits after <br />project implementation during the AM peak period. However, operations are expected to <br />deteriorate to LOS F at the Hesperian Boulevard/Fairmont Drive and the Hesperian Boulevard/ <br />Bayfair Drive intersections during the PM peak period. Appendix 2 shows the expected queuing <br />for the Cumulative Plus Project conditions. <br />Table 8 shows the Arterial LOS analysis results. As shown, the corridor is expected to operate <br />at acceptable LOS during the AM peak period. However, it is expected to deteriorate to LOS F <br />in both northbound and southbound directions during the PM peak period. <br />As shown in Appendix 2, the project is expected to cause significant queueing, especially in <br />the northbound direction. During the AM period, northbound queues are expected to spill back <br />from Fairmont Drive past the Bayfair Drive intersection. The northbound queue from Drew Street <br />is expected to spill back past the rail road tracks to Springlake Drive. In the PM period, <br />northbound queues are expected to extend from Fairmont Drive past Drew Street. Southbound <br />queues are expected to spill back from Springlake Drive past Drew Street and from Thornally <br />Drive to Bayfair Drive. This represents a significant increase from the no project conditions. <br />Table 7: Cumulative Plus Project Delay (Seconds)/LOS <br />Study Intersection Intersection <br />Control AM Peak PM Peak <br />1)Hesperian Boulevard & <br />Fairmont Drive Signalized 51.6/D 72.9/E <br />2)Hesperian Boulevard & <br />Bayfair Drive Signalized 12.9/B 93.6/F <br />3)Hesperian Boulevard & <br />Thornally Drive Signalized 70.7/E 86.1/F <br />4)Hesperian Boulevard & <br />Drew Street Signalized 24.5/C 6.8/A <br />5)Hesperian Boulevard & <br />Springlake Drive Signalized 26.7/C 60.1/E <br />Table 8: Cumulative Plus Project Arterial LOS <br />Study Segment <br />Signal <br />Delay (s) <br />Arterial <br />Speed <br />(mph) <br />Arterial <br />LOS <br />AM <br />NB: Springlake Drive to Fairmont Drive 89.4 14.2 E <br />SB: Fairmont Drive to Springlake Drive 62.0 17.1 D <br />PM <br />NB: Springlake Drive to Fairmont Drive 254.3 7.1 F <br />SB: Fairmont Drive to Springlake Drive 140.0 10.9 F <br />482
The URL can be used to link to this page
Your browser does not support the video tag.