My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2020-149 Bay Fair TOD
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2020
>
Reso 2020-149 Bay Fair TOD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2024 12:10:12 PM
Creation date
1/6/2021 12:47:23 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
12/7/2020
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BAY FAIR TOD SPECIFIC PLAN <br />Reclaimed Water Improvement Projects <br />The Oro Loma Sanitary District provides <br />reclaimed wastewater to the Skywest Golf <br />Course located next to the Hayward Airport. <br />The golf course is approximately 1 mile east <br />of the treatment plant. The closest available <br />reclaimed water is at this treatment plant. <br />With upgrades to the treatment plant and the <br />construction of a 3 mile pipeline, reclaimed <br />water could serve the Plan Area. While <br />reclaimed water may be available at the San <br />Leandro Water Reclamation Facility (WRF), <br />this facility was not considered because the <br />pipeline to reach the Plan Area is two miles <br />farther than the Oro Loma facility. <br />If constructed, this pipe could also serve south <br />San Leandro, San Lorenzo and Ashland, at a <br />minimum. Therefore, the preparation of a <br />Reclaimed Water Master Plan is recommended <br />to determine the appropriate pipe size, <br />location, treatment plant improvements, pump <br />station improvements and costs needed to <br />serve both the Plan Area and potential future <br />landscape corridors, parks and industry. <br />The planning level costs provided in Table <br />7.5 only include estimates to extend a <br />transmission main to the middle of the Plan <br />Area and the backbone service main for <br />irrigation of landscaping and streetside rain <br />gardens. The backbone is assumed to be <br />provided wherever municipal water backbone <br />is constructed. Therefore, Figure 7.3 also <br />shows the proposed location of the reclaimed <br />water infrastructure within the Plan Area. <br />A cost estimate to install a localized recycled <br />water treatment plant is not provided here <br />because the demand from the Plan Area <br />was not analyzed for this Specific Plan and it <br />is assumed that the cost provided in project <br />"R-2" ("Upgrade OLSD Treatment Plant and <br />Construct Reclaimed Water Transmission") is <br />judged to be greater or equal to the cost to <br />construct a localized recycled water treatment <br />plant. <br />Table 7.5 Reclaimed Water Improvements Projects <br />PROJECT <br />ESTIMATED <br />PROJECTEST. <br />(IN 2017 $) <br />TIMING <br />Reclaimed Water <br />Determine whether reclaimed water will be extended to <br />No Cost <br />Short-term <br />Decision <br />the Bay Fair TOD Specific Plan area. <br />Reclaimed Water Master <br />If reclaimed water is pursued, create a reclaimed Water <br />$120,000 <br />Medium <br />Plan <br />Master Plan. <br />If reclaimed water is pursued, upgrade WRF or OLSD <br />Reclaimed Water <br />reclaimed water facilities and construct transmission <br />Treatment & <br />mains between the treatment facilities and the Plan Area. <br />$18,000,000 <br />Medium <br />Transmssion Main <br />Alternatively, install a localized package recycled water <br />treatment plant. <br />Construct reclaimed water distribution before or during <br />Reclaimed Water <br />street and right-of-way construction in coordination with <br />$7,500,000 <br />Medium <br />Backbone <br />future development. <br />Total Potential Reclaimed Water Improvements <br />$25,620,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.