Laserfiche WebLink
Summary <br />Replace existing guardrail along Alvarado with a higher, more robust guardrail. <br />Description <br />Remove and replace approximately 200 linear feet of metal guard rail. New guard rail to be approximately 12" higher <br />than the existing guard rail. <br />Justification or Benefit of Project <br />This project will reduce the risk of a vehicle leaving the roadway at this location. <br />Consequences of not doing the Project <br />Without this project the existing guard rail can remain. <br />Project Numb 2020.4200Project Typ Roadway signage and striping <br />Status Active <br />Department/Sponsor Engineering & Transportatio <br />Impact to Operation Cost Impact to Maintenance Cost Decrease <br />Likely Cost <$100k <br />Categor Roadways for vehicles <br />Possible Funding Sources General Fund, Measure B/BB <br />Detailed Cost <br />Council District <br />Project Name Alvarado at Fremont Vehicle Guardrail