Laserfiche WebLink
C- <br />CONSTRUCTION DETAILS <br />B. RAZEGHI <br />C52725 <br />12-31-20 <br />X:\880_MARINA-DAVIS\640_Landscaping\2 - Landscape Construction Details\0413000126ga002.dgn04 880 22.6/23.8Ala <br />x <br />x <br />x <br />x <br />x <br />Dist COUNTY ROUTE POST MILES <br />TOTAL PROJECT <br />SHEET <br />No. <br />TOTAL <br />SHEETS <br />LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. <br />Exp. <br />CIVILREGISTEREDPROFESSIONAL <br />E <br />NGI <br />NEERST <br />ATEO <br />F CALIFORNIA <br />REGISTERED CIVIL ENGINEER <br />TIME PLOTTED =>DATE PLOTTED =>1:17:30 PM1/3/2020CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE <br />DATE <br />CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. <br />THE ACCURACY OR COMPLETENESS OF SCANNED <br />OR AGENTS SHALL NOT BE RESPONSIBLE FOR <br />THE STATE OF CALIFORNIA OR ITS OFFICERS <br />R07-20-16USERNAME =>Joycer <br />DGN FILE =>0413000126ga002.dgn <br />RELATIVE BORDER SCALE <br />IS IN INCHES <br />0 1 2 3 UNIT 0725 PROJECT NUMBER & PHASE 04130001261BORDER LAST REVISED 7/2/2010 <br />Oakland, CA 94612 <br />Suites 220 & 300 <br />1333 Broadway <br />ACTC <br />BEN RAZEGHISan Jose, CA 95113 <br />Suite 1200 <br />55 South Market St <br />WMH CORPORATION <br />POSTCONCDENSE TREESBRUSHBRUSHTREESDENSECONC35.1 33.3 31.6 31.6 33.1 32.7 31.6 32.6 31.9 31.4 31.7 31.6 33.9 33.6 32.6 33.5 33.7 33.5 33.3 33.3 33.5 33.7 33.4 33.6 34.4 34.1 34.3 34.4 34.1 33.9 34.3 33.9 33.6 33.9 34.3 34.5 34.4 34.8 33.3 31.7 35.1 34.2 34.5 34.9 34.9 34.5 33.3 34.1 34.4 34.8 34.5 33.3 32.7 34.4 33.7 33.7 33.9 33.5 33.1 33.3 33.2 35.5 32.7 30.2 30.5 31.4 34.5 32.4 30.3 35.4 34.6 31.2 23.3 31.6 32.2 31.7 31.2 32.3 31.9 32.9 DAVIS ST.DONOVAN DR.BILLINGS BL.35POSTTS TSTS <br />TS <br />T <br />STS 40353 <br />5 <br />2 <br />5 <br />3 <br />5 <br />3535 <br />35DIKEUB789302 <br />3656170981 <br />DAVIS STREETBI <br />LLI <br />NGS Bl <br />vdDONOVAN Dr <br />SAN LEANDROR/WR/W"DA1" LINE"DR3" LINE"DR1" LINER=33.0’ <br />R=21.0’ <br />41.67’ Rt "DA1" 30+23.64 <br />126.81’ Rt "DA1" 29+34.81 EC <br />50.33’ Rt "DA1" 30+34.17 BC <br />2SCALE: 1"=20’ <br />SECTION C-C <br />NO SCALE <br />2%2% <br />C <br />C <br />3 42 <br />R=58.0’ <br />49.04’ Rt "DA1" 30+22.92 BC <br />OGJOYCE RUSHTONBEN RAZEGHI12’ <br />R=6.0’ <br />R=46.0’ <br />R=4.5’ <br />93.35’ Rt "DA1" 30+60.29 EC <br />129.60’ Rt "DA1" 29+34.43 BC <br />29+46.27 PCC <br />130.35’ Rt "DA1" <br /> 29+60.29 BC <br />103.89’ Rt "DA1" <br />SEG Cl B1 <br />6" Cl 2 AB <br />41.56’ Rt "DA1" 30+35.16 <br />75.23’ Rt "DA1" 30+19.35 EC <br />64.71’ Rt "DA1" 30+14.00 EC <br />CSL Std DETAIL 102 <br />18’ WIDE Dwy PER <br />18’Beg REMOVE CURB, GUTTER & SIDEWALK <br />33.70’ Rt "DA1" 30+19.74 <br />END REMOVE CURB, GUTTER & SIDEWALK <br />33.53’ Rt "DA1" 30+38.93 <br />DETAIL ON C-1 <br />CONSTRUCT SERVICE PAD PER <br />Exist SS MANHOLE <br />NOTES: <br />RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. <br />1. FOR ACCURATE RIGHT OF WAY DATA, CONTACT <br />127