Laserfiche WebLink
BID SUMMARY <br />BID OPENING Spencon Construction FBD Vanguard Kerex Engineering, Inc. <br />DATE: March 17, 2021 3170 Crow Canyon Pl., #250 550 Greenville Road 4941 Pacheco Boulevard <br />TIME: 3:00 p.m. San Ramon, CA 94583 Livermore CA 94550 Martinez, CA 94553 <br />LOCATION: City Clerk's Office Phone: (925) 984-2581 Phone: (925) 245-1300 Phone: (925) 387-8913 <br />Fax: (925) 984-2583 Fax: (925) 245-1007 Fax: (925) 387-0853 <br />ITEM <br />NO.ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST <br />BASE BID <br />1 Mobilization, Staging & Stockpiling per <br />Sections 7-8.4 & 9-3.4 <br />1 LS $25,000.00 $25,000.00 $4,500.00 $4,500.00 $19,770.00 $19,770.00 $45,000.00 $45,000.00 <br />2 Temporary Traffic Control per Section <br />600 <br />1 LS $30,000.00 $30,000.00 $5,000.00 $5,000.00 $28,142.00 $28,142.00 $20,000.00 $20,000.00 <br />3 Curb Ramp Review and Layout per <br />Section 2-9 <br />76 EA $125.00 $9,500.00 $100.00 $7,600.00 $71.00 $5,396.00 $500.00 $38,000.00 <br />4 Install Curb and Gutter per City <br />Standard Plan No. 100 <br />1806 LF $88.00 $158,928.00 $80.00 $144,480.00 $55.00 $99,330.00 $70.00 $126,420.00 <br />5 Install Wheelchair Curb Cut Ramp per <br />City Standard Plan Nos. 106A and <br />106B <br />9856 SF $39.00 $384,384.00 $23.00 $226,688.00 $35.00 $344,960.00 $39.00 $384,384.00 <br />6 Install Sidewalk per City Standard Plan <br />No. 100 <br />924 SF $28.00 $25,872.00 $15.00 $13,860.00 $12.00 $11,088.00 $25.00 $23,100.00 <br />7 Install Concrete Apron per City <br />Standard Plan No. 114 <br />440 SF $45.00 $19,800.00 $40.00 $17,600.00 $14.00 $6,160.00 $40.00 $17,600.00 <br />8 Install Concrete Valley Gutter City <br />Standard Plan No. 114 <br />490 SF $50.00 $24,500.00 $40.00 $19,600.00 $14.00 $6,860.00 $55.00 $26,950.00 <br />9 Install Asphalt Concrete Tie-ins per <br />City Standard Plan Nos. 100 & 114 <br />1632 CF $40.00 $65,280.00 $15.00 $24,480.00 $30.00 $48,960.00 $25.00 $40,800.00 <br />10 Adjust Curb Drain Inlet Hood to Ramp <br />Slope per Section 301-1.6 <br />1 EA $2,000.00 $2,000.00 $1,500.00 $1,500.00 $1,000.00 $1,000.00 $3,500.00 $3,500.00 <br />11 Relocate Roadside Sign and Post per <br />Section 315 <br />2 EA $550.00 $1,100.00 $250.00 $500.00 $277.00 $554.00 $500.00 $1,000.00 <br />12 Relocate Roadside Sign on New Post <br />per Section 315 <br />13 EA $650.00 $8,450.00 $450.00 $5,850.00 $333.00 $4,329.00 $500.00 $6,500.00 <br />QUANTITY ITEM COST ITEM COST ITEM COST <br />PROJECT TITLE:Curb Ramp Upgrades 2021 <br />PROJECT NO.: <br />BID NO.: <br />ENGINEER'S ESTIMATE <br />2021.0070 <br />20-21.012 <br />This document is a summary of bids received for the subject project and are <br />provided only as a convenience. Listing of a particular bid is not a finding that <br />such bid has been found to be responsive or accepted as complete by the City. <br />An award of contract, if any, is subject to approval of the City Council and/or the <br />City Manager. Contractors should refer to the contract documents for bidding <br />information. <br />Prepared by: J. O'Driscoll <br />Date Approved: 2/10/2021 <br />Bid Summary Curb Ramp Upgrades 2021.xlsx Page 1 of 6 Printed 3/19/2021 @ 11:12 AM100