BID SUMMARY
<br />BID OPENING Spencon Construction FBD Vanguard Kerex Engineering, Inc.
<br />DATE: March 17, 2021 3170 Crow Canyon Pl., #250 550 Greenville Road 4941 Pacheco Boulevard
<br />TIME: 3:00 p.m. San Ramon, CA 94583 Livermore CA 94550 Martinez, CA 94553
<br />LOCATION: City Clerk's Office Phone: (925) 984-2581 Phone: (925) 245-1300 Phone: (925) 387-8913
<br />Fax: (925) 984-2583 Fax: (925) 245-1007 Fax: (925) 387-0853
<br />ITEM
<br />NO.ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST
<br />BASE BID
<br />1 Mobilization, Staging & Stockpiling per
<br />Sections 7-8.4 & 9-3.4
<br />1 LS $25,000.00 $25,000.00 $4,500.00 $4,500.00 $19,770.00 $19,770.00 $45,000.00 $45,000.00
<br />2 Temporary Traffic Control per Section
<br />600
<br />1 LS $30,000.00 $30,000.00 $5,000.00 $5,000.00 $28,142.00 $28,142.00 $20,000.00 $20,000.00
<br />3 Curb Ramp Review and Layout per
<br />Section 2-9
<br />76 EA $125.00 $9,500.00 $100.00 $7,600.00 $71.00 $5,396.00 $500.00 $38,000.00
<br />4 Install Curb and Gutter per City
<br />Standard Plan No. 100
<br />1806 LF $88.00 $158,928.00 $80.00 $144,480.00 $55.00 $99,330.00 $70.00 $126,420.00
<br />5 Install Wheelchair Curb Cut Ramp per
<br />City Standard Plan Nos. 106A and
<br />106B
<br />9856 SF $39.00 $384,384.00 $23.00 $226,688.00 $35.00 $344,960.00 $39.00 $384,384.00
<br />6 Install Sidewalk per City Standard Plan
<br />No. 100
<br />924 SF $28.00 $25,872.00 $15.00 $13,860.00 $12.00 $11,088.00 $25.00 $23,100.00
<br />7 Install Concrete Apron per City
<br />Standard Plan No. 114
<br />440 SF $45.00 $19,800.00 $40.00 $17,600.00 $14.00 $6,160.00 $40.00 $17,600.00
<br />8 Install Concrete Valley Gutter City
<br />Standard Plan No. 114
<br />490 SF $50.00 $24,500.00 $40.00 $19,600.00 $14.00 $6,860.00 $55.00 $26,950.00
<br />9 Install Asphalt Concrete Tie-ins per
<br />City Standard Plan Nos. 100 & 114
<br />1632 CF $40.00 $65,280.00 $15.00 $24,480.00 $30.00 $48,960.00 $25.00 $40,800.00
<br />10 Adjust Curb Drain Inlet Hood to Ramp
<br />Slope per Section 301-1.6
<br />1 EA $2,000.00 $2,000.00 $1,500.00 $1,500.00 $1,000.00 $1,000.00 $3,500.00 $3,500.00
<br />11 Relocate Roadside Sign and Post per
<br />Section 315
<br />2 EA $550.00 $1,100.00 $250.00 $500.00 $277.00 $554.00 $500.00 $1,000.00
<br />12 Relocate Roadside Sign on New Post
<br />per Section 315
<br />13 EA $650.00 $8,450.00 $450.00 $5,850.00 $333.00 $4,329.00 $500.00 $6,500.00
<br />QUANTITY ITEM COST ITEM COST ITEM COST
<br />PROJECT TITLE:Curb Ramp Upgrades 2021
<br />PROJECT NO.:
<br />BID NO.:
<br />ENGINEER'S ESTIMATE
<br />2021.0070
<br />20-21.012
<br />This document is a summary of bids received for the subject project and are
<br />provided only as a convenience. Listing of a particular bid is not a finding that
<br />such bid has been found to be responsive or accepted as complete by the City.
<br />An award of contract, if any, is subject to approval of the City Council and/or the
<br />City Manager. Contractors should refer to the contract documents for bidding
<br />information.
<br />Prepared by: J. O'Driscoll
<br />Date Approved: 2/10/2021
<br />Bid Summary Curb Ramp Upgrades 2021.xlsx Page 1 of 6 Printed 3/19/2021 @ 11:12 AM100
|