Laserfiche WebLink
BID SUMMARY <br />BID OPENING Spencon Construction FBD Vanguard Kerex Engineering, Inc. <br />DATE: March 17, 2021 3170 Crow Canyon Pl., #250 550 Greenville Road 4941 Pacheco Boulevard <br />TIME: 3:00 p.m. San Ramon, CA 94583 Livermore CA 94550 Martinez, CA 94553 <br />LOCATION: City Clerk's Office Phone: (925) 984-2581 Phone: (925) 245-1300 Phone: (925) 387-8913 <br />Fax: (925) 984-2583 Fax: (925) 245-1007 Fax: (925) 387-0853 <br />ITEM <br />NO.ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COSTQUANTITYITEM COST ITEM COST ITEM COST <br />PROJECT TITLE:Curb Ramp Upgrades 2021 <br />PROJECT NO.: <br />BID NO.: <br />ENGINEER'S ESTIMATE <br />2021.0070 <br />20-21.012 <br />Prepared by: J. O'Driscoll <br />Date Approved: 2/10/2021 <br />13 Paint New Curb Red per 314-4 8 SEG $240.00 $1,920.00 $400.00 $3,200.00 $166.00 $1,328.00 $500.00 $4,000.00 <br />14 Work Site Safety, per Section 7-10.4.1 1 LS $8,000.00 $8,000.00 $1,500.00 $1,500.00 $215.00 $215.00 $5,000.00 $5,000.00 <br />TOTAL BASE BID:$764,734.00 $476,358.00 $578,092.00 $742,254.00 <br />BID ALTERNATE A <br />1A.Mobilization, Staging & Stockpiling per <br />Sections 7-8.4 & 9-3.4 <br />1 LS $2,000.00 $2,000.00 $4,500.00 $4,500.00 $6,000.00 $6,000.00 $15,000.00 $15,000.00 <br />2A.Temporary Traffic Control per Section <br />600 <br />1 LS $3,000.00 $3,000.00 $2,500.00 $2,500.00 $9,077.00 $9,077.00 $7,500.00 $7,500.00 <br />3A.Curb Ramp Review and Layout per <br />Section 2-9 <br />11 EA $125.00 $1,375.00 $100.00 $1,100.00 $98.00 $1,078.00 $500.00 $5,500.00 <br />4A.Install Curb and Gutter per City <br />Standard Plan No. 100 <br />250 LF $88.00 $22,000.00 $80.00 $20,000.00 $55.00 $13,750.00 $55.00 $13,750.00 <br />5A.Install Wheelchair Curb Cut Ramp per <br />City Standard Plan Nos. 106A and <br />106B <br />1408 SF $39.00 $54,912.00 $23.00 $32,384.00 $35.00 $49,280.00 $39.00 $54,912.00 <br />6A.Install Sidewalk per City Standard Plan <br />No. 100 <br />132 SF $28.00 $3,696.00 $15.00 $1,980.00 $12.00 $1,584.00 $20.00 $2,640.00 <br />7A.Install Concrete Apron per City <br />Standard Plan No. 114 <br />80 SF $45.00 $3,600.00 $40.00 $3,200.00 $14.00 $1,120.00 $50.00 $4,000.00 <br />9A.Install Asphalt Concrete Tie-ins per <br />City Standard Plan Nos. 100 & 114 <br />202 CF $40.00 $8,080.00 $15.00 $3,030.00 $30.00 $6,060.00 $40.00 $8,080.00 <br />12A.Relocate Roadside Sign on New Post <br />per Section 315 <br />4 EA $650.00 $2,600.00 $450.00 $1,800.00 $333.00 $1,332.00 $500.00 $2,000.00 <br />13A.Paint New Curb Red per 314-4 5 SEG $240.00 $1,200.00 $400.00 $2,000.00 $166.00 $830.00 $500.00 $2,500.00 <br />14A.Work Site Safety, per Section 7-10.4.1 1 LS $1,000.00 $1,000.00 $1,500.00 $1,500.00 $215.00 $215.00 $2,500.00 $2,500.00 <br />TOTAL BID ALTERNATE A:$103,463.00 $73,994.00 $90,326.00 $118,382.00 <br />TOTAL BASE BID: <br />TOTAL BASE BID + ALTERNATE BID ITEM A: <br />$764,734.00 <br />$668,418.00$868,197.00 $550,352.00 <br />$578,092.00 $742,254.00$476,358.00 <br />$860,636.00 <br />Bid Summary Curb Ramp Upgrades 2021.xlsx Page 2 of 6 Printed 3/19/2021 @ 11:12 AM101