BID SUMMARY <br />BID OPENING <br />DATE: March 17, 2021 <br />TIME: 3:00 p.m. <br />LOCATION: City Clerk's Office <br />ITEM <br />NO.ITEM UNIT COST ITEM COSTQUANTITY <br />PROJECT TITLE:Curb Ramp Upgrades 2021 <br />PROJECT NO.: <br />BID NO.: <br />ENGINEER'S ESTIMATE <br />2021.0070 <br />20-21.012 <br />Prepared by: J. O'Driscoll <br />Date Approved: 2/10/2021 <br />13 Paint New Curb Red per 314-4 8 SEG $240.00 $1,920.00 <br />14 Work Site Safety, per Section 7-10.4.1 1 LS $8,000.00 $8,000.00 <br />TOTAL BASE BID:$764,734.00 <br />BID ALTERNATE A <br />1A.Mobilization, Staging & Stockpiling per <br />Sections 7-8.4 & 9-3.4 <br />1 LS $2,000.00 $2,000.00 <br />2A.Temporary Traffic Control per Section <br />600 <br />1 LS $3,000.00 $3,000.00 <br />3A.Curb Ramp Review and Layout per <br />Section 2-9 <br />11 EA $125.00 $1,375.00 <br />4A.Install Curb and Gutter per City <br />Standard Plan No. 100 <br />250 LF $88.00 $22,000.00 <br />5A.Install Wheelchair Curb Cut Ramp per <br />City Standard Plan Nos. 106A and <br />106B <br />1408 SF $39.00 $54,912.00 <br />6A.Install Sidewalk per City Standard Plan <br />No. 100 <br />132 SF $28.00 $3,696.00 <br />7A.Install Concrete Apron per City <br />Standard Plan No. 114 <br />80 SF $45.00 $3,600.00 <br />9A.Install Asphalt Concrete Tie-ins per <br />City Standard Plan Nos. 100 & 114 <br />202 CF $40.00 $8,080.00 <br />12A.Relocate Roadside Sign on New Post <br />per Section 315 <br />4 EA $650.00 $2,600.00 <br />13A.Paint New Curb Red per 314-4 5 SEG $240.00 $1,200.00 <br />14A.Work Site Safety, per Section 7-10.4.1 1 LS $1,000.00 $1,000.00 <br />TOTAL BID ALTERNATE A:$103,463.00 <br />TOTAL BASE BID: <br />TOTAL BASE BID + ALTERNATE BID ITEM A: <br />$764,734.00 <br />$868,197.00 <br />Rosas Brothers Construction Sposeto Engineering, Inc.Burch Engineering & Construction <br />4731 Coliseum Way 4558 Contractors Place 180 Mendell Street <br />Oakland, CA 94601 Livermore, CA 94551 San Francisco, CA 94124 <br />Phone: (510) 534-1077 Phone: (925) 443-4200 Phone: (415) 294-5100 <br />Fax: (510) 534-5077 Fax: (925) 443-6800 Fax: (415) 762-0170 <br />UNIT COST UNIT COST UNIT COSTITEM COST ITEM COST ITEM COST <br />$300.00 $2,400.00 $190.00 $1,520.00 $200.00 $1,600.00 <br />$2,000.00 $2,000.00 $4,000.00 $4,000.00 $5,000.00 $5,000.00 <br />$745,624.00 $771,908.00 $875,524.00 <br />$10,000.00 $10,000.00 $2,000.00 $2,000.00 $25,000.00 $25,000.00 <br />$10,000.00 $10,000.00 $3,500.00 $3,500.00 $10,000.00 $10,000.00 <br />$400.00 $4,400.00 $500.00 $5,500.00 $150.00 $1,650.00 <br />$90.00 $22,500.00 $106.00 $26,500.00 $85.00 $21,250.00 <br />$40.00 $56,320.00 $32.00 $45,056.00 $55.00 $77,440.00 <br />$30.00 $3,960.00 $32.00 $4,224.00 $18.00 $2,376.00 <br />$45.00 $3,600.00 $45.00 $3,600.00 $15.00 $1,200.00 <br />$32.00 $6,464.00 $51.00 $10,302.00 $11.00 $2,222.00 <br />$500.00 $2,000.00 $720.00 $2,880.00 $500.00 $2,000.00 <br />$300.00 $1,500.00 $190.00 $950.00 $200.00 $1,000.00 <br />$2,000.00 $2,000.00 $4,000.00 $4,000.00 $2,500.00 $2,500.00 <br />$122,744.00 $108,512.00 $146,638.00 <br />$875,524.00 <br />$880,420.00 $1,022,162.00 <br />$745,624.00 $771,908.00 <br />$868,368.00 <br />Bid Summary Curb Ramp Upgrades 2021.xlsx Page 5 of 6 Printed 3/19/2021 @ 11:12 AM104