Laserfiche WebLink
BID SUMMARY <br />BID OPENING <br />DATE: March 17, 2021 <br />TIME: 3:00 p.m. <br />LOCATION: City Clerk's Office <br />ITEM <br />NO.ITEM UNIT COST ITEM COST <br />BASE BID <br />1 Mobilization, Staging & Stockpiling per <br />Sections 7-8.4 & 9-3.4 <br />1 LS $25,000.00 $25,000.00 <br />2 Temporary Traffic Control per Section <br />600 <br />1 LS $30,000.00 $30,000.00 <br />3 Curb Ramp Review and Layout per <br />Section 2-9 <br />76 EA $125.00 $9,500.00 <br />4 Install Curb and Gutter per City <br />Standard Plan No. 100 <br />1806 LF $88.00 $158,928.00 <br />5 Install Wheelchair Curb Cut Ramp per <br />City Standard Plan Nos. 106A and <br />106B <br />9856 SF $39.00 $384,384.00 <br />6 Install Sidewalk per City Standard Plan <br />No. 100 <br />924 SF $28.00 $25,872.00 <br />7 Install Concrete Apron per City <br />Standard Plan No. 114 <br />440 SF $45.00 $19,800.00 <br />8 Install Concrete Valley Gutter City <br />Standard Plan No. 114 <br />490 SF $50.00 $24,500.00 <br />9 Install Asphalt Concrete Tie-ins per <br />City Standard Plan Nos. 100 & 114 <br />1632 CF $40.00 $65,280.00 <br />10 Adjust Curb Drain Inlet Hood to Ramp <br />Slope per Section 301-1.6 <br />1 EA $2,000.00 $2,000.00 <br />11 Relocate Roadside Sign and Post per <br />Section 315 <br />2 EA $550.00 $1,100.00 <br />12 Relocate Roadside Sign on New Post <br />per Section 315 <br />13 EA $650.00 $8,450.00 <br />QUANTITY <br />PROJECT TITLE:Curb Ramp Upgrades 2021 <br />PROJECT NO.: <br />BID NO.: <br />ENGINEER'S ESTIMATE <br />2021.0070 <br />20-21.012 <br />Prepared by: J. O'Driscoll <br />Date Approved: 2/10/2021 <br /> <br />Rosas Brothers Construction Sposeto Engineering, Inc.Burch Engineering & Construction <br />4731 Coliseum Way 4558 Contractors Place 180 Mendell Street <br />Oakland, CA 94601 Livermore, CA 94551 San Francisco, CA 94124 <br />Phone: (510) 534-1077 Phone: (925) 443-4200 Phone: (415) 294-5100 <br />Fax: (510) 534-5077 Fax: (925) 443-6800 Fax: (415) 762-0170 <br />UNIT COST UNIT COST UNIT COST <br />$10,000.00 $10,000.00 $14,000.00 $14,000.00 $50,000.00 $50,000.00 <br />$10,000.00 $10,000.00 $82,000.00 $82,000.00 $50,000.00 $50,000.00 <br />$400.00 $30,400.00 $475.00 $36,100.00 $150.00 $11,400.00 <br />$90.00 $162,540.00 $106.00 $191,436.00 $85.00 $153,510.00 <br />$40.00 $394,240.00 $29.00 $285,824.00 $55.00 $542,080.00 <br />$30.00 $27,720.00 $29.00 $26,796.00 $18.00 $16,632.00 <br />$45.00 $19,800.00 $30.00 $13,200.00 $15.00 $6,600.00 <br />$50.00 $24,500.00 $45.00 $22,050.00 $25.00 $12,250.00 <br />$32.00 $52,224.00 $51.00 $83,232.00 $11.00 $17,952.00 <br />$2,500.00 $2,500.00 $2,400.00 $2,400.00 $1,000.00 $1,000.00 <br />$400.00 $800.00 $450.00 $900.00 $500.00 $1,000.00 <br />$500.00 $6,500.00 $650.00 $8,450.00 $500.00 $6,500.00 <br />ITEM COST ITEM COST ITEM COST <br />Bid Summary Curb Ramp Upgrades 2021.xlsx Page 4 of 6 Printed 3/19/2021 @ 11:12 AM103