Laserfiche WebLink
DescriptionCurrent Fee ReferenceProposed Fee ExplanationCOMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division1 Plans and SpecificationsSee Engineering & Transportation Department Item 7, Public Work Projectsfee proposed to remain unchanged2 Building Permit FeesA. Filing and Issuance Fee$128 plus valuation fees and/or other building fees as listed below$130 1.72% CPI increaseRe-filing Fee for each resubmittal, deferred submittal, and/or revision after 1st resubmittal, or upon 2nd resubmittal for plan check on same project50% of Filing and Issuance Fee per occurrencefee proposed to remain unchangedB. Permit Feefee proposed to remain unchangedi) New Buildings, Additions, Tenant Improvements, Residential Remodels, and Combined Mechanical, Electrical and/or Plumbing Permits$1 to $5,000$197 $200 1.72% CPI increase$5,001 to $10,000$197 for the first $5,000 plus $59.13 for each add'l $1,000 or fraction thereof, to and including $10,000$200 plus $60.151.72% CPI increase$10,001 to $50,000$493 for the first $10,000 plus $17.25 for each add'l $1,000 or fraction thereof, to and including $50,000$501 plus $17.551.72% CPI increase$50,001 to $100,000$1,183 for the first $50,000 plus $15.77 for each add'l $1,000 or fraction thereof, to and including $100,000$1,203 plus $16.041.72% CPI increase$100,001 to $500,000$1,971 for the first $100,000 plus $12.81 for each add'l $1,000 or fraction thereof, to and including $500,000$2,005 plus $13.031.72% CPI increase$500,001 to $1,000,000$7,096 for the first $500,000 plus $4.73 for each add'l $1,000 or fraction thereof, to and including $1,000,000$7,218 plus $4.811.72% CPI increase$1,000,001 and up$9,460 for the first $1,000,000 plus $4.49 for each additional $1,000 or fraction thereof over $1,000,000$9,623 plus $4.571.72% CPI increaseii) Stand-Alone Plumbing PermitUp to $2,000$99 $101 1.72% CPI increase$2,001 to $5,000$197 $200 1.72% CPI increase$5,001 to $10,000$197 for the first $5,000 plus $39.42 for each add'l $1,000 or fraction thereof, to and including $10,000$200 plus $40.11.72% CPI increase$10,001 and up$394 for the first $10,000 plus $13.14 for each additional $1,000 or fraction thereof over $10,000$401 plus $13.371.72% CPI increaseiii) Stand-Alone Electrical PermitUp to $2,000$99 $101 1.72% CPI increase$2,001 to $5,000$197 $200 1.72% CPI increase$5,001 to $10,000$197 for the first $5,000 plus $39.42 for each add'l $1,000 or fraction thereof, to and including $10,000$200 plus $40.11.72% CPI increase$10,001 and up$394 for the first $10,000 plus $13.14 for each additional $1,000 or fraction thereof over $10,000$401 plus $13.371.72% CPI increaseiv) Stand-Alone Mechanical PermitUp to $2,000$99 $101 1.72% CPI increase$2,001 to $5,000$197 $200 1.72% CPI increase$5,001 to $10,000$197 for the first $5,000 plus $39.42 for each add'l $1,000 or fraction thereof, to and including $10,000$200 plus $40.101.72% CPI increase$10,001 and up$394 for the first $10,000 plus $13.14 for each additional $1,000 or fraction thereof over $10,000$401 plus $13.371.72% CPI increasev) Residential 1 and 2 Family Re-roofa) Main dwelling roof$275 all sizes and materials$280 1.72% CPI increaseb) Detached garages and accessory structures on same property as main dwelling and done at the same time as the main dwelling roof.$88 $90 1.72% CPI increasevi) Inspection of the installation of an earthquake gas shutoff valve$33.47 with no Filing & Issuance Fee$34 1.72% CPI increasevii) Residential Seismic Retrofit projects using "Plan set A" (for one and two family residences)$77 plus Filing and Issuance Fee and other miscellaneous fees$78 1.72% CPI increaseviii) Photovoltaic Systemsa) Residentiali) Up to 15kW$296 $301 1.72% CPI increaseii) each additional kW over 15kW$16 $16 1.72% CPI increaseDetermination of Valuation for Fee-Setting Purposes: Valuation shall be based on total value of all construction work, as determined by the Building Official, including all finish work, roofing, electrical, plumbing, heating, air conditioning, elevators, fire-extinguishing systems and any other permanent equipment).For new construction project valuations which the Building Official believes are understated at submittal, valuation may be determined using the most current International Code Council (ICC) valuation table modified to account for a regional construction cost modifier of 16% or the most currently available regional construction cost modifier (i.e. construction value in ICC Table * 1.16).For tenant improvement, residential remodels, or other projects that do not involve new square footage project valuations which the Building Official believes are understated at submittal, valuation may be determined using, up to 50% of, the most current International Code Council (ICC) valuation table modified to account for a regional construction cost modifier of 16% or the most currently available regional construction cost modifier (i.e. up to 50% of construction value in ICC Table * 1.16).Note: The Building Official may adjust the plan checking/permit fee for an individual project when costs to the City are not congruent with this fee schedule.59