My WebLink
|
Help
|
About
|
Sign Out
Home
5B Public Hearings 2021 0503
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2021
>
Packet 2021 0503
>
5B Public Hearings 2021 0503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 11:32:18 PM
Creation date
4/28/2021 11:31:44 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/3/2021
Retention
PERM
Document Relationships
Reso 2021-066 Amd Admin Code Fees and Service Charges
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
DescriptionCurrent Fee ReferenceProposed Fee ExplanationCOMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued)b) Commerciali) Up to 25kW$413 $420 1.72% CPI increaseii) 26kW - 50kW$620 $630 1.72% CPI increaseiii) each additional kW (51kW - 250kW) $7fee proposed to remain unchangediv) each additional kW over 250kW$5fee proposed to remain unchangedix) SignsSign permit fees are based on all signs being on the same property and on the same permit.a) 1st Non-energized sign attached to building.$111 $112 1.72% CPI increaseb) each additional sign thereafter:$56 $57 1.72% CPI increasec) Pylon sign, energized or not, each:$233 $237 1.72% CPI increased) Monument sign, energized or not, each$175 $178 1.72% CPI increasee) Relocation or alteration of any sign electronically or mechanically, but not including replacement of tubing, transformers and such parts subject to failure; or shop inspection by the local inspection department in lieu of a UL label (a local electrical inspection department label of approval shall be required), each$88 $89 1.72% CPI increasex) Demolitiona) Commercial/Residential Demolition up to 3,000SF$296 $302 1.72% CPI increaseb) Each Additional 10,000SF$197 $201 1.72% CPI increaseC. Plan Checking FeePlan checking fee shall be paid at the time of application for a building permit. The plan checking fee isin addition to the building permit fee and shall be as follows:i) Plan Check Fee, if applicable 80% of building permit feefee proposed to remain unchangedii) For Master Plans (i.e. identical buildings built by the same builder on the same lot or in the same tract and for which building permits are issued at the same time)A full plan checking fee shall be paid for each Master Plan when more than one building will be built and one-third (33%) of the full plan checking fee shallbe paid for each production phase building at time of application.iii) Changes, revisions, or additions to plans previously checked$197 per hour; 1 hour minimum charge$201 1.72% CPI increaseiv) Additional plan review after the first re-check$197 per hour; 1 hour minimum charge$201 1.72% CPI increasev) Alternate Methods and Materials$197 per hour; 1 hour minimum charge$201 1.72% CPI increasevi) Energy Conservation - for all buildings and projects subject to the California Energy Commission’s conservation regulations20% of building permit feefee proposed to remain unchangedD. Miscellaneous Feesi) Miscellaneous Inspectionsa) Fees for inspection not otherwise set forth herein$197 per hour; 1 hour minimum charge$201 1.72% CPI increaseb) Fees for inspection conducted outside of normal business hours$297 hourly rate; 2 hour minimum charge$302 1.72% CPI increaseii) Investigation Feesa) Investigation fee for work commenced without first obtaining permits as required by the San Leandro Municipal Code, whether or not a permit is subsequently issuedb) Investigation fee for conditions that are not in compliance with the San Leandro Zoning and/or Municipal Codes$197 per hour; 1 hour minimum charge$201 1.72% CPI increaseNote: Payment of any investigation fees does not exempt any person from compliance with all other provisions of applicable codes in the execution of the work nor from any other penalties prescribed by law.(1)(2)E. Other Fees and Charges (i) Technology Fee6% of permit fee, minimum $6.87 per permit type$6.991.72% CPI increase (ii) Community Planning Fee (for commercial, industrial & residential projects)0.3% of total valuation of constructionfee proposed to remain unchanged (iii) Strong Motion Impact Fee: State mandated tax for the Seismic Safety Commission for seismic monitoring. -- Residential0.00013 per $1.00 Valuation or fraction thereof with a $0.50 min. fee proposed to remain unchanged -- Commercial/Industrial0.00028 per $1.00 Valuation or fraction thereof with a $.50 min.fee proposed to remain unchanged (iv) Building Standards Commission (SB1473) Fee: State Mandated tax for Green Building Standards collected for the State by the City.All Residential, Commercial, and Industrial permits that use Valuation to determine permit fees: $1.00 per $25,000 valuation or fraction thereof with a $1.00 minimum.fee proposed to remain unchanged (v) Exception to Noise Ordinance$463$4711.72% CPI increase (vi) Certificate of Occupancy$197 per hour; 1 hour minimum charge$2011.72% CPI increaseNote: For photovoltaic systems, total permit fees, including applicable Permit Issuance and Filing Fees, Automation Fees, Community Planning Fees, and other mandated fees shall not exceed amounts authorized via Government Code Section 66015.Note: For small tenant improvements to existing buildings and ADUs, the Chief Building Official and/or the Community Development Director may waive the Community Planning Fee at his/her discretionCommunity Planning Fee will not be charged for the following project types: permits for accessory dwelling units; stand-alone mechanical, plumbing, and electrical permits; minor residential remodels, and; minor tenant improvements.60
The URL can be used to link to this page
Your browser does not support the video tag.