My WebLink
|
Help
|
About
|
Sign Out
Home
5B Public Hearings 2021 0503
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2021
>
Packet 2021 0503
>
5B Public Hearings 2021 0503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 11:32:18 PM
Creation date
4/28/2021 11:31:44 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/3/2021
Retention
PERM
Document Relationships
Reso 2021-066 Amd Admin Code Fees and Service Charges
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Description Current Fee Reference Proposed Fee Explanation <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued) <br />ii) Investigation Fees <br />a) Investigation fee for work commenced without first obtaining permits as required by the San <br />Leandro Municipal Code, whether or not a permit is subsequently issued <br />b) Investigation fee for conditions that are not in compliance with the San Leandro Zoning and/or <br />Municipal Codes <br />$197 per hour; 1 hour minimum charge $201 1.84% CPI increase <br />Note: Payment of any investigation fees does not exempt any person from compliance with all <br />other provisions of applicable codes in the execution of the work nor from any other penalties <br />prescribed by law. <br />(1) <br />(2) <br />E. Other Fees and Charges <br /> (i) Technology Fee 6% of permit fee, minimum $6.87 per permit type $7.00 1.84% CPI increase <br /> (ii) Community Planning Fee (for commercial, industrial & residential projects)0.3% of total valuation of construction fee proposed to remain unchanged <br /> (iii) Strong Motion Impact Fee: State mandated tax for the Seismic Safety Commission for seismic <br />monitoring. <br /> -- Residential 0.00013 per $1.00 Valuation or fraction thereof with a $0.50 min. fee proposed to remain unchanged <br /> -- Commercial/Industrial 0.00028 per $1.00 Valuation or fraction thereof with a $.50 min.fee proposed to remain unchanged <br /> (iv) Building Standards Commission (SB1473) Fee: State Mandated tax for Green Building Standards <br />collected for the State by the City. <br />All Residential, Commercial, and Industrial permits that use <br />Valuation to determine permit fees: $1.00 per $25,000 valuation or <br />fraction thereof with a $1.00 minium. <br />fee proposed to remain unchanged <br /> (v) Exception to Noise Ordinance $463 $471 1.84% CPI increase <br /> (vi) Certificate of Occupancy $197 per hour; 1 hour minimum charge $201 1.84% CPI increase <br /> (vii) Temporary Certificate of Occupancy per 30 days $197 per hour; 1 hour minimum charge $201 1.84% CPI increase <br /> (viii) Certificate of Compliance:$197 per hour; 1 hour minimum charge $201 1.84% CPI increase <br /> (ix) House Moving Permit $197 per hour; 1 hour minimum charge $201 1.84% CPI increase <br /> (x) Microfilm Copies $1.20 fee proposed to remain unchanged <br /> (xi) Photocopies $0.10 per page fee proposed to remain unchanged <br /> (xii) Microfilming of Permit and Plans includes imaging fee for fire permits: (For purposes of fee <br />charges, each permit is considered a drawing) <br /> -- 8-1/2 x 11 or 11 x 14 drawings including fire permits $1.90 per sheet fee proposed to remain unchanged <br /> -- All other size drawings $2.10 per sheet fee proposed to remain unchanged <br /> (xiii) Appeals Direct Costs (1)fee proposed to remain unchanged <br />(1)Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs fee proposed to remain unchanged <br />(2)fee proposed to remain unchanged <br />(3)Administrative Citations <br />Building Code Violation <br />- First Violation $130 Government code <br />- Second Violation $700 Government code <br />- Third Violation $1,300 Government code <br />Each additional violation of the same ordinance within two years of the first violation $2,500 Government code <br />Note: For small tenant improvements to existing buildings and ADUs, the Chief Building Official and/or the Community Development Director may waive the Community Planning Fee at his/her discretion. <br />Community Planning Fee will not be charged for the following project types: permits for accessory dwelling units; stand-alone mechanical, plumbing, and electrical permits; minor residential remodels, <br />and; minor tenant improvements. <br />Community Planning Fee will not be charged for the following project types: permits for accessory dwelling units; stand-alone mechanical, plumbing, and electrical permits; minor residential remodels, <br />and; minor tenant improvements. <br />33
The URL can be used to link to this page
Your browser does not support the video tag.