Last Revised: 06/01/16 Page 5 Agreement
<br />Sanitary Sewer Point Repairs 2021 Project No. 2020.0120
<br />CONTRACT PRICE SCHEDULE
<br />
<br />Item
<br />No.
<br />Description Estimated
<br />Quantity
<br />(A)
<br />Unit of
<br />Measure
<br />Item UNIT Price
<br />(in Words)
<br />Item UNIT Price
<br />(in Figures)
<br />(B)
<br />TOTAL
<br />PRICE
<br />(in Figures)
<br />(AxB)
<br />1.
<br />
<br />Mobilization, Staging &
<br />Stockpiling per Sections
<br />7-8.4 & 9-3.4
<br />1 LS
<br />Forty Thousand Dollars $40,000.00 $40,000.00
<br />2.
<br />
<br />Temporary Traffic
<br />Control – Level 1, per
<br />Section 600
<br />29 EA
<br />Two Hundred Dollars
<br />
<br />$200.00
<br />
<br />$5,800.00
<br />
<br />3.
<br />
<br />Temporary Traffic
<br />Control – Level 2, per
<br />Section 600
<br />23 EA
<br />Three Hundred Dollars
<br />
<br />$300.00
<br />
<br />$6,900.00
<br />
<br />4.
<br />
<br />Temporary Traffic
<br />Control – Level 3, per
<br />Section 600
<br />29 EA
<br />Four Hundred Dollars
<br />
<br />$400.00
<br />
<br />$11,600.00
<br />
<br />5.
<br />
<br />Pipe Cleaning & CCTV
<br />Inspection , per section
<br />500-1.1
<br />24,220 LF
<br />Two Dollars
<br />
<br />$2.00
<br />
<br />$48,440.00
<br />
<br />6.
<br />
<br />Sheeting, Shoring &
<br />Bracing, per section 306-
<br />4
<br />1 LS
<br />Twenty Thousand Dollars
<br />
<br />$20,000
<br />
<br />$20,000.00
<br />
<br />7.
<br />
<br />Unstable Bedding
<br />Material, per section
<br />306-6.1
<br />300 LF
<br />Five Dollars
<br />
<br />$5.00
<br />
<br />$1,500.00
<br />
<br />8.
<br />
<br />Trench Excavation &
<br />Backfill, 0’-5’ Depth, per
<br />sections 306-3, 306-5,
<br />306-6 & 306-12
<br />115 LF
<br />Eighty Dollars
<br />
<br />$80.00
<br />
<br />$9,200.00
<br />
<br />9.
<br />
<br />Trench Excavation &
<br />Backfill, 5’-8’ Depth, per
<br />sections 306-3, 306-5,
<br />306-6 & 306-12
<br />1,187 LF
<br />Ninety Dollars
<br />
<br />$90.00
<br />
<br />$106,830.00
<br />
<br />10.
<br />
<br />Trench Excavation &
<br />Backfill, 8’-11’ Depth,
<br />per sections 306-3, 306-
<br />5, 306-6 & 306-12
<br />30 LF
<br />One Hundred Dollars
<br />
<br />$100.00
<br />
<br />$3,000.00
<br />
<br />11.
<br />
<br />Trench Excavation &
<br />Backfill, 11’-15’ Depth,
<br />per sections 306-3, 306-
<br />5, 306-6 & 306-12
<br />20 LF
<br />One Hundred Ten Dollars
<br />
<br />$110.00
<br />
<br />$2,200.00
<br />
<br />12.
<br />
<br />Restricted Access
<br />Excavation & Backfill by
<br />Hand & Small
<br />Equipment, 0’-6’ Depth,
<br />per sections 306-3, 306-
<br />5, 306-6 & 306-12
<br />92 LF
<br />Two Hundred Dollars
<br />
<br />$200.00
<br />
<br />$18,400.00
<br />
<br />13.
<br />
<br />Lateral Repair, 4-inch
<br />Pipeline Replacement,
<br />per section 306-7
<br />100 LF
<br />One Hundred Fifty Dollars
<br />
<br />$150.00
<br />
<br />$15,000.00
<br />
<br />14.
<br />
<br />Point Repair, 6-inch
<br />Pipeline Replacement,
<br />per section 306-7
<br />954 LF
<br />Seven Hundred Seventy-
<br />Seven Dollars
<br />
<br />$777.00
<br />
<br />$741,258.00
<br />