Laserfiche WebLink
Last Revised 06/01/16 Page 6 Agreement <br />Sanitary Sewer Point Repairs 2021 Project No. 2020.0120 <br />15. <br /> <br />Point Repair, 8-inch <br />Pipeline Replacement, <br />per section 306-7 <br />120 LF <br />Seven Hundred Seventy- <br />Eight Dollars <br /> <br />$778.00 <br /> <br />$93,360.00 <br /> <br />16. <br /> <br />Point Repair, 10-inch <br />Pipeline Replacement, <br />per section 306-7 <br />4 LF <br />Seven Hundred Seventy- <br />Nine Dollars <br /> <br />$779.00 <br /> <br />$3,116.00 <br /> <br /> <br />17. <br /> <br /> <br />Not Used 0 EA <br />Zero Dollars $0.00 <br /> <br />$0.00 <br /> <br />18. <br /> <br />Reconnect Service <br />Lateral to 6-inch Main <br />Pipeline, per section 306- <br />7 <br />93 EA <br />One Hundred Dollars <br /> <br />$100.00 <br /> <br />$9,300.00 <br /> <br />19. <br /> <br />Reconnect Service <br />Lateral to 8-inch Main <br />Pipeline, per section 306- <br />7 <br />13 EA <br />Two Hundred Dollars <br /> <br />$200.00 <br /> <br />$2,600.00 <br /> <br />20. <br /> <br />Install New Type A-2 <br />Manhole, 0’-5’ Depth, <br />per section 306-7 <br />6 EA <br />Nine Thousand Dollars <br /> <br />$9,000.00 <br /> <br />$54,000.00 <br /> <br />21. <br /> <br />Install New Type A-2 <br />Manhole, 5’-10’ Depth, <br />per section 306-7 <br />18 EA <br />Nine Thousand Five <br />Hundred Dollars <br /> <br />$9,500.00 <br /> <br />$171,000.00 <br /> <br />22. <br /> <br />Install New Type A-2 <br />Manhole, 10’-15’ Depth, <br />per section 306-7 <br />2 EA <br />Ten Thousand Dollars <br /> <br />$10,000.00 <br /> <br />$20,000.00 <br /> <br />23. <br /> <br />Install New Type A <br />Manhole, 10’-15’ Depth, <br />per section 306-7 <br />1 EA <br />Ten Thousand Dollars <br /> <br />$10,000.00 <br /> <br />$10,000.00 <br /> <br />24. <br /> <br />Replace Type A-2 MH <br />Barrels, Cone, Frame & <br />Cover, 10’ Depth, per <br />section 306-7 <br />1 EA <br />Ten Thousand Dollars <br /> <br />$10,000.00 <br /> <br />$10,000.00 <br /> <br />25. <br /> <br />Install New Type C <br />Manhole, 5’-10’ Depth, <br />per section 306-7 <br />1 EA <br />Six Thousand Dollars <br /> <br />$6,000.00 <br /> <br />$6,000.00 <br /> <br />26. <br /> <br />Repair/Rehabilitate <br />Manhole Bench and <br />Channel, per section 500- <br />5.2 <br />25 EA <br />Five Hundred Dollars <br /> <br />$500.00 $12,500.00 <br /> <br />27. <br /> <br />Expose and Raise <br />Lamphole Frame & <br />Cover to Grade, per <br />section 300-1.6 <br />2 EA <br />Five Hundred Dollars <br /> <br />$500.00 <br /> <br />$1,000.00 <br /> <br />28. <br /> <br />Expose and Raise <br />Manhole Frame & Cover <br />to Grade, per section <br />300-1.6 <br />2 EA <br />Five Hundred Dollars <br /> <br />$500.00 <br /> <br />$1,000.00 <br /> <br />29. <br /> <br />Replace Survey <br />Monument, per sections <br />2-9.1 and 3096 <br />5 EA <br />Two Hundred Dollars <br /> <br />$200.000 <br /> <br />$1,000.00 <br /> <br />30. <br /> <br />Remove Abandoned <br />Lamphole/Cleanout <br />Structure, per section <br />306-3.3 <br />2 EA <br />Two Hundred Dollars <br /> <br />$200.00 <br /> <br />$400.00 <br /> <br />DocuSign Envelope ID: FE7F8D79-6B0F-42D1-812E-8070B1B7DE55