My WebLink
|
Help
|
About
|
Sign Out
Home
CSA Westland sewer 04112021
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2021
>
CSA Westland sewer 04112021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2021 2:04:59 PM
Creation date
5/18/2021 2:04:55 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
4/12/2021
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Last Revised 06/01/16 Page 7 Agreement <br />Sanitary Sewer Point Repairs 2021 Project No. 2020.0120 <br /> <br /> <br /> <br /> <br />TOTAL BID: One Million Eight Hundred Seventy-Four Thousand Fifty-Eight Dollars <br /> (In Words) <br /> <br />TOTAL BID: $1,874,058.00 <br /> (In Figures) <br /> <br /> <br />31. <br /> <br />Grout Fill Abandoned In- <br />place 6-inch Pipeline, per <br />section 306-3.3 <br />124 LF <br />Three Dollars <br /> <br />$3.00 <br /> <br />$372.00 <br /> <br />32. <br /> <br />AC Pavement <br />Restoration 6-inch <br />Depth, per section 302-5 <br />9,218 SF <br />Ten Dollars <br /> <br />$10.00 <br /> <br />$92,180.00 <br /> <br />33. <br /> <br />AC Pavement <br />Restoration 9-inch <br />Depth, per section 302-5 <br />2,347 SF <br />Twelve Dollars <br /> <br />$12.00 $28,164.00 <br /> <br />34. <br /> <br />Concrete Curb and <br />Gutter Restoration, Per <br />Section 303-5 <br />20 LF <br />Twenty Dollars <br /> <br />$20.00 <br /> <br />$400.00 <br /> <br />35. <br /> <br />Concrete Sidewalk <br />Restoration, Per Section <br />303-5 <br />130 SF <br />Ten Dollars <br /> <br />$10.00 <br /> <br />$1,300.00 <br /> <br />36. <br /> <br />Concrete Driveway <br />Restoration, Per Section <br />303-5 <br />110 SF <br />Ten Dollars $10.00 <br /> <br />$1,100.00 <br /> <br />37. <br /> <br />Landscape Removal and <br />Restoration, per sections <br />306-13.8 <br />771 SF <br />Ten Dollars $10.00 <br /> <br />$7,710.00 <br /> <br />38. <br /> <br />Rehabilitate 6-inch Host <br />Pipeline with Cured-in- <br />Place Pipeline, per <br />section 500-1.4 <br />2,907 LF <br />Thirty-Eight Dollars <br /> <br />$38.00 <br /> <br />$110,466.00 <br /> <br />39. <br /> <br />Rehabilitate 8-inch Host <br />Pipeline with Cured-in- <br />Place Pipeline, per <br />section 500-1.4 <br />380 LF <br />Forty-Seven Dollars <br /> <br />$47.00 <br /> <br />$17,860.00 <br /> <br />40. <br /> <br />Re-establish Service <br />Lateral Connections in <br />CIPP Rehabilitated <br />Pipelines, per Section <br />500-1.4.7 <br />113 EA <br />One Hundred Twenty-Five <br />Dollars <br /> <br />$125.00 <br /> <br />$14,125.00 <br /> <br />41. <br /> <br />Replace and upsize 361 <br />LF of 8-inch Pipeline <br />with New to 10-inch <br />pipeline by open trench <br />Method, including trench <br />excavation, backfill and <br />surface restoration, per <br />Section 306-7 <br />1 LS <br />One Hundred Sixty-Four <br />Thousand Nine Hundred <br />Seventy-Seven Dollars <br /> <br />$164,977.00 <br /> <br />$164,977.00 <br /> <br />42. <br /> <br /> <br />Work Site Safety, per <br />Section 7-10.4.1 1 LS <br />Ten Thousand Dollars <br /> <br />$10,000.00 <br /> <br />$10,000.00 <br /> <br />DocuSign Envelope ID: FE7F8D79-6B0F-42D1-812E-8070B1B7DE55
The URL can be used to link to this page
Your browser does not support the video tag.