My WebLink
|
Help
|
About
|
Sign Out
Home
Climatec_Installation_Agreement 12102020
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2020
>
Climatec_Installation_Agreement 12102020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2021 10:36:22 AM
Creation date
5/26/2021 10:35:33 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
12/10/2020
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 11 of 16 <br /> <br />5451 Chavenelle Road, Dubuque, Iowa 52002 ◼ [O] 563.585.0967 ◼ www.unisonsolutions.com <br />Design and content included in this document is proprietary and remains the property of Unison Solutions, Inc. <br />- Piping and wiring skid (bridge) for space separation between classified and non- <br />classified areas <br />- Glycol piping installed in bridge is pre-insulated with flexible connections for field <br />installation <br />- All conduit and wiring installed on bridge with flexes for field installation. All wiring is <br />pre-labeled for landing in assigned terminal blocks. <br />- Bridge bolts to the Gas Upgrading Skid, Chiller Skid then bolts to the Bridge <br /> <br />SUBMITTALS <br /> <br />- Quantity: (3) copies of 3 ring binders and (1) electronic CD copy <br />- Shop Drawings and Product Data will be provided in sufficient detail to confirm compliance <br />with the requirements for the project. Shop Drawings and Product Data will be provided in a <br />complete submittal package. <br />- Shop Drawings <br />- Installation drawings and specifically prepared technical data, including design <br />capacities will be provided. <br />- Specifically prepared wiring diagrams unless standard wiring diagrams are submitted <br />with product data will be provided. <br />- Written description of operation will be provided. <br /> - Product Data <br /> - Catalog cuts and product specifications for each product specified will be provided. <br />- Standard wiring diagrams unless wiring diagrams are specifically prepared and <br />submitted with Shop Drawings will be provided. <br /> <br />FACTORY TESTING <br /> <br />- The System will be tested on ambient air at Unison’s facility prior to shipment. <br />- The CUSTOMER is allowed to witness the testing and Unison will inform the customer (2) <br />weeks prior to anticipated testing date so customer can make travel arrangements. <br /> <br />OPERATION & MAINTENANCE MANUALS <br /> <br />- Quantity: (3) copies of 3 ring binders and (1) electronic CD copy <br />- After shipment the Gas Conditioning System will be provided with a specifically prepared <br />Operation & Maintenance Manuals. The information provided includes a system overview, <br />operator interface, start-up/shut down procedures, communications, alarms procedures, <br />maintenance overview, mechanical component spec sheets and electrical component spec <br />sheets. <br /> <br />MANUFACTURER’S FIELD SERVICES <br /> <br />START-UP SERVICES <br /> <br />- Includes fifteen (15) non-consecutive, 8-hour days, three trips for two Unison <br />Technicians onsite with travel and expenses included. <br /> <br /> <br />DocuSign Envelope ID: 1DDC1773-ED91-404B-97DD-AC3EFDBAD0DD
The URL can be used to link to this page
Your browser does not support the video tag.