My WebLink
|
Help
|
About
|
Sign Out
Home
5A Public Hearings 2021 0607
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2021
>
Packet 2021 0607
>
5A Public Hearings 2021 0607
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2021 10:06:20 AM
Creation date
6/4/2021 10:05:51 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/7/2021
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
4 <br />Municipal <br />Financial <br />Services <br />Current CUPA Fees, Quantities and Revenue <br />x$1000 <br />Fee Quantity Revenue <br />Hazardous Materials Storage <br />Hazardous Material Storage Quantity Range 1 $132 296 $39.1 <br />Hazardous Material Storage Quantity Range 2 $266 381 $101.3 <br />Hazardous Material Storage Quantity Range 3 $382 130 $49.7 <br />Hazardous Material Storage Quantity Range 4 $499 78 $38.9 <br />Hazardous Material Storage Quantity Range 5 $623 5 $3.1 <br />Storage of Radioactive Materials $184 2 $0.4 <br />Hazardous Materials Generation <br />Hazardous Waste Generation Conditionally Exempt Small Quantity Generator $184 161 $29.6 <br />Hazardous Waste Generation Conditionally Exempt Small Quantity Generator, Zero Discharge $92 2 $0.2 <br />Hazardous Waste Generation Small Quantity Generator $369 115 $42.4 <br />Hazardous Waste Generation Large Quantity Generator $662 21 $13.9 <br />Hazardous Waste Generation Universal Small Quantity Generator $184 2 $0.4 <br />Underground Hazardous Materials Storage <br />Underground Hazardous Materials Storage $139 120 $16.7 <br />Storage Tanks Installation and Removal <br />Aboveground Storage Tank Installation $972 1 $0.0 <br />Aboveground Storage Tank Installation, Each Additional $324 0 $0.0 <br />Underground Storage Tank Installation $2,915 1 $0.0 <br />Underground Storage Tank Installation, Each Additional $324 0 $0.0 <br />Underground Storage Tank Removal $1,620 1 $0.0 <br />Underground Storage Tank Removal, Each Additional $258 0 $0.0 <br />Aboveground Petroleum Storage Tank <br />Qualified Facility, Tier 1 & 2 $162 27 $4.4 <br />Non-Qualified Facility (full Spill Prevention Control and Countermeasure Plan)$285 9 $2.6 <br />California Accidental Release Program <br />California Accidental Release Program, Level 1 $632 0 $0.0 <br />California Accidental Release Program, Level 2 $822 3 $2.5 <br />California Accidental Release Program, Level 3 $1,066 1 $1.1 <br />California Accidental Release Program, Level 4 $1,600 0 $0.0 <br />Hazardous Waste On-site Treatment <br />Hazardous Waste On-site Treatment Permit-by-Rule Permit $1,205 0 $0.0 <br />Hazardous Waste On-site Treatment Conditional Authorization Permit $514 1 $0.0 <br />Hazardous Waste On-site Treatment Conditional Exempt Permit $139 0 $0.0 <br />Total Revenue, Certified Unified Program Agency (CUPA) Fees $346.174
The URL can be used to link to this page
Your browser does not support the video tag.