My WebLink
|
Help
|
About
|
Sign Out
Home
8B Consent 2021 0607
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2021
>
Packet 2021 0607
>
8B Consent 2021 0607
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2021 10:06:31 AM
Creation date
6/4/2021 10:06:22 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/7/2021
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 21-293 <br />·Transportation Goal T-3 Promote and accommodate alternative, environmentally-friendly <br />methods of transportation, such as walking and bicycling. <br />·Transportation Goal T-5 Improve major transportation arteries for circulation in and <br />around the city. <br />Environmental Review <br />This project is categorically exempt from the California Environmental Quality Act (CEQA) per <br />Section 15301 Class 1(b) of the CEQA guidelines. The Notice of Exemption was filed with the <br />Alameda County Recorder on February 7, 2020. <br />Board/Commission Review and Actions <br />The Planning Commission voted at its meeting on September 3, 2020 to recommend <br />implementation of a road diet on Fairmont Drive. <br />Summary of Public Outreach Efforts <br />The Notice to Bidders was published in the Daily Review, the South County Post, Visión Hispana <br />and Sing Tao. Staff also notified twenty-three builders’ exchanges and construction data firms as <br />well as a list of contractors that asked to be notified of bidding opportunities via email. The project <br />is described on the Engineering and Transportation Department website. <br />Two mandatory pre-bid meetings were held on May 4, 2021 and May 6, 2021. The intent of these <br />meetings was to inform bidders of the project details, including the City’s Local Inclusion <br />Ordinance and the CWA. <br />For the Fairmont Drive Road Diet, a community meeting was held at the Bayfair Center on July <br />10, 2018 and a survey was taken at the Cherry Festival on June 2, 2018. <br />Prior to construction, staff will notify the residents in the immediate proximity of the work areas. <br />The contractor will also provide notification in the form of door hangers immediately before the <br />work starts. <br />Fiscal Impacts <br />The total project cost is estimated as follows: <br />Design and Bid: $135,000 <br />Construction Contract Pavement Sealing:$3,656,891 <br />Construction Contingency Pavement Sealing $731,380 <br />Construction Contract Curb Ramps 2020 (with a separate contract):$322,000 <br />Construction Contract Curb Ramps 2021 (with a separate contract):$551,000 <br />Construction Contingency Curb Ramps 2021(with a separate contract):$83,000 <br />Construction Management and Inspection (ramps and seal):$170,000 <br />Project Total $5,649,271 <br />Page 4 City of San Leandro Printed on 6/4/2021 <br />97
The URL can be used to link to this page
Your browser does not support the video tag.