My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2021 0719
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2021
>
Packet 2021 0719
>
8F Consent 2021 0719
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2021 4:32:07 PM
Creation date
7/15/2021 4:31:50 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
7/19/2021
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Non-Professional Services Agreement between July 6, 2021 <br />City of San Leandro and Redwood Painting Company, Inc. Exhibit A Page 16 of 24 <br />K. Remove spatter and droppings after completion of coating. <br /> <br />L. When multiple coats of same material are specified, tint prime coat and <br />intermediate coats with suitable pigment to distinguish each coat. <br /> <br />M. Dust coatings between coats. Lightly sand and dust surfaces to receive high <br />gloss finishes, unless instructed otherwise by coating manufacturer. <br /> <br />N. Apply coating by brush, roller, trowel, or spray, unless particular method of <br />application is required by coating manufacturer's instructions or these <br />Specifications. <br /> <br />O. Plural component application: Drums shall be premixed each day. All gauges <br />shall be working order prior to the start of application. Ratio checks shall be <br />completed prior to each application. A spray sample shall be sprayed on plastic <br />sheeting to insure set time is complete prior to each application. Hardness testing <br />shall be preformed after each application. <br /> <br />P. Spray application: <br />1. Stripe coat edges, welds, nuts, bolts, difficult to reach areas by brush before <br />beginning spray application, as necessary, to ensure specified coating <br />thickness along edges. <br />2. When using spray application, apply coating to thickness not greater than that <br />recommended in coating manufacturer's instructions for spray application. <br />3. Use airless spray method, unless air spray method is required by coating <br />manufacturer's instruction or these Specifications. <br />4. Conduct spray coating under controlled conditions. Protect adjacent <br />construction and property from coating mist, fumes, or overspray. <br /> <br />Q. Drying and recoating: <br />1. Provide fans, heating devices, or other means recommended by coating <br />manufacturer to prevent formation of condensate or dew on surface of <br />substrate, coating between coats and within curing time following application <br />of last coat. <br />2. For submerged service the CONTRACTOR shall provide a letter to the <br />ENGINEER that the lining system is fully cured and ready to be placed into <br />service. <br />3. Limit drying time to that required by these Specifications or coating <br />manufacturer's instructions. <br />4. Do not allow excessive drying time or exposure which may impair bond <br />between coats. <br />5. Recoat epoxies within time limits recommended by coating manufacturer. <br />6. When time limits are exceeded, abrasive blast clean and de-gloss clean prior <br />to applying another coat. <br />640
The URL can be used to link to this page
Your browser does not support the video tag.