Laserfiche WebLink
<br />Non-Professional Services Agreement between July 19, 2021 <br />City of San Leandro and Redwood Painting Company, Inc. Exhibit A Page 2 of 24 <br />Epoxy Base and UV resistant Aliphatic or Aliphatic-Acrylic Polyurethane Topcoat <br />or equivalent specified in 09960- 2.03 Coating Materials D. System C. High <br />Solids Epoxy to extend 6 inches below the water line. <br /> <br />E. If there are areas of the structure that are structurally questionable due to rust or <br />other causes, then work on that area only shall cease until a City representative <br />can inspect and a plan for correcting it is determined and implemented. <br /> <br /> <br />F. Except as specifically noted otherwise, provide and pay for the following: <br />1. Insurance and bonds. <br />2. Labor, materials, and equipment. <br />3. Tools, equipment, and machinery required for construction. <br />4. Utilities required for construction. <br />5. Temporary facilities including sheeting and shoring. <br />6. Traffic control and dust control measures. <br />7. Other facilities and services necessary for proper execution and completion of <br />the Work. <br /> <br />G. Secure and pay for all permits including, but not limited to, City Building Permit, <br />OSHA excavation permits, Storm Water Pollution Prevention Permit, Bay Area <br />Air Quality Management District Permits, Department of Transportation permits, <br />government fees and licenses. <br /> <br />H. Comply with codes, ordinances, regulations, orders, and other legal requirements <br />of public authorities having bearing or jurisdiction on the performance of the <br />Work. <br /> <br />I. Location of Project <br />The Work is located at the Water Pollution Control Plant, 3000 Davis Street, San <br />Leandro, CA 94577. <br /> <br />J. OWNER ASSIGNED SUBCONTRACTORS <br />Assignment of subcontractors by OWNER is not anticipated. <br /> <br />K. OWNER FURNISHED EQUIPMENT <br /> <br />L. OWNER will furnish the following products: None. <br /> <br />M. ACTIVITIES BY OTHERS <br />1. OWNER, utilities, and others may perform activities within Project area while <br />the Work is in progress. Schedule the Work with OWNER, utilities, and others <br />to minimize mutual interference. <br />2. Activities by others which may affect performance of work include: <br />a. Normal daily operation of the wastewater treatment plant by OWNER. <br />DocuSign Envelope ID: BCD58F18-CC63-40CC-B673-999B5DE97062