My WebLink
|
Help
|
About
|
Sign Out
Home
NPSA Redwood Painting Company 08022021
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2021
>
NPSA Redwood Painting Company 08022021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2021 1:29:10 PM
Creation date
8/2/2021 1:28:38 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
8/2/2021
Retention
PERM
Document Relationships
Reso 2021-114 NPSA Redwood Painting Co
(Approved)
Path:
\City Clerk\City Council\Resolutions\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Non-Professional Services Agreement between July 19, 2021 <br />City of San Leandro and Redwood Painting Company, Inc. Exhibit A Page 19 of 24 <br />4) Recoat or apply succeeding epoxy coats within 30 days or within time <br />limits recommended by manufacturer, whichever is shorter. Prepare <br />surfaces for recoating in accordance with manufacturer's instructions. <br /> <br />3.09 ASPHALT VARNISH <br /> <br />A. Preparation: <br />1. Prepare surfaces in accordance with general preparation requirements. <br /> <br />B. Application: <br />1. Apply coatings in accordance with general application requirements and as <br />follows: <br />a. Apply minimum 2 coats. <br /> <br />3.10 PROTECTIVE COAL TAR <br /> <br />A. Preparation: <br />1. Prepare surfaces in accordance with general preparation coal tar <br />requirements. <br /> <br />B. Application: <br />1. Apply coatings in accordance with general application requirements and as <br />follows: <br />a. Apply minimum 20 mils dry film thickness coating. <br /> <br />3.11 COAL TAR EPOXY <br /> <br />A. Preparation: <br />1. Prepare surfaces in accordance with general preparation requirements and <br />as follows: <br />a. Abrasive blast iron or steel surfaces to be coated as submerged metal in <br />accordance with SSPC SP-5. Prepare other metal surfaces to be coated <br />with coal tar epoxy in accordance with epoxy manufacturer's instructions. <br /> <br />B. Application: <br />1. Apply coatings in accordance with general application requirements and as <br />follows: <br />a. Waterproofing outside surfaces of concrete structures: Apply minimum 2 <br />coats with total dry film thickness of 40 mils. <br />b. All other locations: Apply 2 coats of 8 mils each for a total 16 mils dry film <br />thickness. <br />c. Apply coal tar epoxy on blasted steel on same day that steel is blasted. <br />d. Apply succeeding coats over previous coat as soon as application does <br />not cause sagging, within the following times, or as recommended by the <br />coating manufacturer, whichever is sooner. <br />2. Average Temperature Degrees <br />DocuSign Envelope ID: BCD58F18-CC63-40CC-B673-999B5DE97062
The URL can be used to link to this page
Your browser does not support the video tag.