My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt to Conds 903 Manor Blvd 04092021
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2021
>
Agmt to Conds 903 Manor Blvd 04092021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 5:37:48 PM
Creation date
11/17/2021 2:03:43 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16. Building Permit plans shall show that all abandoned driveways or damaged curb, <br />gutter and/or sidewalk shall be removed and replaced according to City standard <br />Plans Dwg. No. 100, 102 and 104. Plans shall show ADA path grades and control <br />point elevations across the proposed driveway on Manor Boulevard. <br />17. Sign installations must be per City of San Leandro Standard Plans Dwg. No. 136. <br />18. The City's traffic impact fee program is called "Development Fee for Street <br />Improvements" (DFSI). According to the adopted 2019-20 Fee Schedule, the rate <br />for "General Residential" land use is $1,449.91 per unit. Credit for existing 28,687 <br />gross SF building for "Personal Service" land use category at the rate of $2.41 will <br />be assumed and as such no DFSI is due for this project. <br />19. The project is within the Marina Boulevard/Interstate 880 Interchange Traffic Impact <br />Fee Zone. According to the adopted 2019-20 Fee Schedule, the rate for "General <br />Residential" land use is $729.28 per unit. Credit for existing 28,687 gross SF <br />building for "Personal Service" land use category at the rate of $2.47 will be <br />assumed and as such no fee is due for this project. <br />20. A Park Facilities Development Impact Fee shall be assessed assuming 39 dwelling <br />units (du) will be added to the property as follows: <br />Park Land Acquisition Fee: $14,667.00/du or $572,013.00 <br />Park Improvement Fee: $2,348.00/du or $91,572.00 <br />Total Park Impact Fee: $17,014.00/du or $663,546.00 <br />Please note that this is an estimated amount. These fees are subject to change <br />at the start of each fiscal year and will not be vested until issuance of building <br />permit. <br />21. Manor Boulevard is in the City's adopted Underground Utility District Master Plan. <br />As such, an in -lieu fee is required in the amount of $61,749.87 which is calculated <br />at $1,583.33 per residential unit. This fee is subject to change at the beginning of <br />each fiscal year and is not vested until Building Permit issuance. <br />VII. ALAMEDA COUNTY FIRE DEPARTMENT REQUIREMENTS <br />Please note that these conditions do not constitute a complete fire and building code <br />review. A formal plan check review will be completed at time of building permit <br />submittal. The buildings will need to comply with all building and fire code <br />requirements in affect at time of building permit submittal. <br />The R-3 Occupancies shall be provided with NFPA 13D fire sprinkler systems. <br />2. Hydrants shall be provided as recorded. <br />3. Fire Access Routes shall be provided as recorded. <br />4. Smoke Alarms shall be provided per the CBC 2016 edition. <br />5. Carbon Monoxide detectors shall be provided per the CFC 2016 edition. <br />6. Illuminated addresses shall be provided on a contrasting background. <br />Conditions of Approval September 9, 2020 <br />PLN19-0037 903 Manor Blvd. Page 9 off <br />
The URL can be used to link to this page
Your browser does not support the video tag.