My WebLink
|
Help
|
About
|
Sign Out
Home
8C Consent 2021 1206
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2021
>
Packet 2021 1206
>
8C Consent 2021 1206
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 8:22:33 PM
Creation date
12/2/2021 8:22:22 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
12/6/2021
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and CSG Consultants, Inc. <br />for Engineering Plan Check Services for San Leandro Shoreline Development Exhibit A – Page 1 of 1 <br />EXHIBIT A <br />SCOPE OF SERVICES <br /> <br />Plan Check Services for San Leandro Shoreline Development Projects <br />• Research and review civil engineering and site planning designs on properties subject to <br />development or improvement referencing documents provided by developers and/or owners. <br />• Review the civil engineering and site planning aspects of tentative maps and/or land development <br />applications for conformance with City standards as part of the City’s entitlement process. <br />• Review submitted improvement plans for conformance with, adopted City standards, approved <br />Conditions of Approval, and/or accepted industry practice. <br />• Review documents that demonstrate compliance with Provision C.3 of the adopted Municipal <br />Regional Permit (MRP) and the C.3 Technical Guidance published by the Alameda Countywide <br />Clean Water Program. <br />• Review storm drain and/or sanitary sewer hydraulic calculations for conformance with City <br />standards and/or accepted industry practice. <br />• Review technical studies such as traffic studies, geotechnical investigations, environmental site <br />assessments, preliminary title reports, etc. <br />• Review documents associated with submitted Grading Permit applications pursuant to Chapter 7- <br />12 of the City of San Leandro Municipal Code. <br />• Communicate identified issues in clear, concise writing to City staff and/or the developer’s design <br />professionals. <br />• Visit sites that are subject to grading and/or development as directed by City staff to gain direct <br />knowledge of topographic features or physical constraints. <br />• Attend meetings with City staff, developers, property owners, and/or technical consultants. <br /> <br />Task Initiation and Performance <br />• Consultant shall be notified in writing by City staff of a task. Task notifications shall include a <br />summary of the work to be completed, a timeframe for completing the work, and the City staff <br />member who will be the point of contact. <br />• Upon receiving the task, Consultant shall respond to the City within 72 hours with any questions <br />regarding the task, including any issues with being able to complete the task in the time allotted, <br />request for task clarification, etc. <br />• Any materials required for a task, such as drawings or calculations, will be transmitted to <br />Consultant via the United States Postal Service or electronically via email or OneDrive, if possible. <br /> <br />SCHEDULE <br /> <br />CSG Consultants will work on an on-call basis as needed. <br /> <br /> <br /> <br /> <br />48
The URL can be used to link to this page
Your browser does not support the video tag.