My WebLink
|
Help
|
About
|
Sign Out
Home
8C Consent 2021 1206
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2021
>
Packet 2021 1206
>
8C Consent 2021 1206
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 8:22:33 PM
Creation date
12/2/2021 8:22:22 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
12/6/2021
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and CSG Consultants, Inc. <br />for Engineering Plan Check Services for San Leandro Shoreline Development Exhibit B – Page 1 of 1 <br />EXHIBIT B <br />COMPENSATION SCHEDULE & REIMBURSABLE EXPENSES <br /> <br />CSG services are billed on a time-and-materials basis according to our Standard Rates, shown below. <br /> <br />PROFESSIONAL ENGINEERING SERVICES 2021-22 HOURLY RATE <br /> Engineering Trainee $60.00 <br /> Administrative Assistant $80.00 <br /> Analyst $135.00 <br /> Engineering Designer/CASp Inspection & Consultation $145.00 <br /> Construction Inspector $145.00 <br /> Senior Analyst $160.00 <br /> Assistant Resident Engineer $175.00 <br /> Assistant Engineer $150.00 <br /> Associate Engineer $175.00 <br /> Senior Construction Inspector $165.00 <br /> Senior Engineer $205.00 <br /> Senior Land Surveyor $205.00 <br /> Resident Engineer $210.00 <br /> Structure Representative $210.00 <br /> Senior Structural Engineer $225.00 <br /> Senior Project Manager $225.00 <br /> Principal Engineer $240.00 <br /> Senior Principal Engineer $260.00 <br /> Two-Person Survey Crew $340.00 <br /> <br />SUSTAINABILITY PROGRAM MANAGEMENT SERVICES HOURLY RATE <br /> Sustainability Program Analyst $135.00 <br /> Sustainability Program Senior Analyst $160.00 <br /> Sustainability Program Manager $190.00 <br /> <br />All hourly rates include overhead costs including, but not limited to, salaries, benefits, Workers <br />Compensation Insurance, travel and office expenses. CSG will coordinate the pickup and return of plans to <br />and from CSG offices. Overtime work will be billed at 1.5x the hourly rates indicated in the table above. On <br />each anniversary of the contract start date, CSG will initiate a rate increase based on change in CPI-U for <br />the applicable region. CSG will mail/email an invoice every month for services rendered during the previous <br />month. <br /> <br /> <br /> <br /> <br />49
The URL can be used to link to this page
Your browser does not support the video tag.