My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2022-017 Updated Sewer System Mgmt Plan
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2022
>
Reso 2022-017 Updated Sewer System Mgmt Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 7:22:00 PM
Creation date
1/25/2022 2:40:50 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
1/18/2022
Retention
PERM
Document Relationships
9G Consent
(Amended by)
Path:
\City Clerk\City Council\Agenda Packets\2022\Packet 01182022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />Sewer System Management Plan <br />Volume I <br />q Fmnsncs gnsce.z /aar���as c Cworxpianc v��". <br />Q Searrli <br />recr \'l4 42 � cn.rn.c,L_i�- <br />r cxkY�\ <br />Metropolitan <br />Oakland <br />International <br />\ Airport <br />MIL <br />The City sets aside $1.5 million in the Water Pollution Control Division budget annually to <br />conduct point repairs and complete emergency repairs. <br />Manhole Inspections <br />Inspections conducted for manholes involve a visual assessment of the overall manhole condition <br />and observed deficiencies that could result in I/1. As part of the focused and cyclic cleaning <br />programs, City Collections staff visually inspects manholes for corrosion, debris or damage <br />around the base, cracks or holes, and condition of manhole steps. <br />Ratings applied to manhole investigations use the standards of the NASSCO Manhole Condition <br />Assessment Program (MCAP) for each of the manhole structure components including the rim <br />and lid, chimney/cone, bench and channel. Each component is rated as poor, fair, or good <br />condition as a gross determination of construction adequacy of the structure and its component <br />parts. <br />Detailed investigations of manhole condition follows at a time when a connecting line segment is <br />defined as a rehab project, and corrections needed to the manhole structure are then included as <br />part of the project work. <br />Pump Station Inspections and Assessment <br />Pump stations are inspected on a weekly basis. Weekly inspections include visual check of the <br />equipment, manual cycling of pumps, checking and cleaning floats, recording hour meter <br />readings, and cleaning off debris. <br />Pump stations are inspected extensively every year. Extensive maintenance includes cleaning out <br />of sump, and removing pumps for inspection and performing repairs if necessary. <br />Page 120 <br />
The URL can be used to link to this page
Your browser does not support the video tag.