My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2022-017 Updated Sewer System Mgmt Plan
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2022
>
Reso 2022-017 Updated Sewer System Mgmt Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 7:22:00 PM
Creation date
1/25/2022 2:40:50 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
1/18/2022
Retention
PERM
Document Relationships
9G Consent
(Amended by)
Path:
\City Clerk\City Council\Agenda Packets\2022\Packet 01182022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />Sewer System Management Plan <br />Volume I <br />Legal Authority <br />The City has legal authority to prohibit discharges to the collection system through the Uniform <br />Wastewater Discharge Regulations, Title III, Chapter 14, Article 3 (Sewer Use Regulations) and <br />Article 7 (Monitoring and Inspection) of the City of San Leandro Municipal Code. <br />Source Control <br />Beginning in 2002, the City's Environmental Services Section (ES) identified Food Service <br />Establishments (FSEs) located within the collection system service area. In January 2003, a <br />letter, survey and FOG fact sheet were mailed to 125 FSEs as the first part of a FOG education <br />and outreach program. Information on the FSEs is maintained in ES's database, and records are <br />periodically updated via information from business permit applications, the business license <br />permit database, and building permits. <br />ES staff conducts permit plan checks on new construction and tenant improvements of FSEs. <br />Plan checks include, but are not limited to, identification and proper connection of grease - <br />bearing fixtures to a properly sized grease interceptor. The plan check and field inspection, as <br />part of the building permit process, includes an interceptor sizing component and an Interceptor <br />Maintenance Education component, which includes the City's maintenance requirements, BMP <br />requirements, and record keeping and reporting requirements. A list of all such users is <br />maintained by the City. <br />The City's Uniform Wastewater Discharge Regulations (UWDR) requires the installation and <br />proper maintenance of interceptors at any facility that has the potential for discharging grease - <br />laden wastewater. The UWDR also includes specific definitions and language pertaining to FOG <br />from FSEs. <br />Facility Inspection <br />ES inspectors conduct inspections at FSEs in areas identified by the collection crew as FOG hot <br />spots. Inspections include a review of grease interceptor maintenance records, FOG BMPs, and <br />storm water BMPs. Inspections are conducted at new or remodeled FSEs as part of the building <br />permit final review process to verify grease interceptor installation. FOG and storm water BMP <br />information is also provided to the facility at this time. <br />During these site visits, the City's FOG fact sheet is distributed and each of the elements (FOG, <br />storm water, and integrated pest management) is discussed. Posters and storm water BMP <br />guidance from the Alameda Countywide Clean Water Program are also distributed. <br />Identification and Sewer Cleaning <br />Page 128 <br />
The URL can be used to link to this page
Your browser does not support the video tag.