My WebLink
|
Help
|
About
|
Sign Out
Home
9I Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 01182022
>
9I Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 10:34:16 AM
Creation date
4/1/2022 9:40:39 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Retention
PERM
Document Relationships
Reso 2022-019 CSA CSG Consultants Inc
(Amended)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 3 of 4 <br /> <br />Task 4 Bid and Construction Support Services <br />CSG and ACEE have budgeted limited hours for bid and construction support services to assist the City <br />with RFI’s, submittal reviews and changes required to construct the project as shown in the final bid <br />documents. Additional effort beyond this budget allocation required for other design services during <br />construction will require additional fee. <br /> <br />Exclusions <br />The following items are specifically excluded from our proposed scope of services for this phase; however, <br />they can be provided by and/or subcontracted through CSG as additional services upon the City’s request: <br />· Surveying and right of way mapping. The location of the railroad right of way at Thrasher Park <br />assumed to be constant through this segment of the railroad corridor. <br />· Geotechnical Recommendations. Default soil design parameters from the CBC will be used for <br />the design. <br />· Landscape Architectural design. <br />· Utility Coordination. There are no apparent utilities in conflict with the proposed scoreboard <br />locations. <br />· Scoreboard Control Options: Control Communications selection and design is not included in our <br />scope. <br />Schedule <br />Work will be performed under the overall supervision of Tom Walker, PE, Principal Engineer. CSG staff <br />will start the work after receiving notice to proceed (NTP) from the City. Draft plans and calculations will <br />be submitted within six weeks from receiving an executed task order. Final plans and structural <br />calculations will be submitted two weeks after receiving comments from the City on the draft submittal. <br />Fee <br />CSG’s fee for the services described above assumes that 2 CSG staff will perform the work. Our fee for <br />performing the work described above will be based on our Standard Fees as listed in the Agreement and <br />billed on a time and materials basis, not to exceed the amount shown below unless authorized in advance <br />by the City. Due to the nature of working with existing infrastructure elements, CSG has added a 15% <br />contingency for the project design. This contingency will only be used for added tasks approved by the <br />City. <br /> <br />Staff Hourly Rate Hours Fee <br />Tom Walker, PE – Principal Engineer $200 74 $14,800 <br />Assistant Engineer $140 108 $15,120 <br />ACEE – Electrical $24,381 <br />15% Contingency <br />(City Authorized Added Tasks Only) $8,145 <br />Total Fee $62,446 <br /> <br /> <br />172
The URL can be used to link to this page
Your browser does not support the video tag.