Laserfiche WebLink
<br />Page 2 of 4 <br /> <br /> <br />Scope of Services <br />Task 1 Meetings and Coordination <br />Following a kick-off meeting with the City, CSG review available as-built plans as provided by the City and <br />will perform a site visit to clearly define identify site constraints that may impact the proposed structure <br />layout and design. Observations will be limited to exposed members that are not covered by vegetation. <br />CSG will review and coordinate sign layouts with the City as the design is developed. <br />Task 2 BallPark Scoreboard Structure Design <br />Following completion of the site review in Task 1, CSG will develop draft plans for the scoreboard location <br />layouts to be reviewed by the City Public Works Department staff, and other City staff as determined by <br />the City. <br />After the City approves the proposed scoreboard locations, the CSG Team will prepare the plans and <br />calculations. Specifications will be shown on the plan sheets. The design will adhere to the requirements <br />of the 2019 California Building Code (CBC) and will be stamped and signed by a California Licensed Civil <br />Engineer. Plan sheets are anticipated to include: <br /> <br /> Title Sheet: 1 sheet <br /> Site Layout Sheets: 3 sheets (one for each ballpark) <br /> Sign Foundation Details and Plan Based Specifications: 1-2 sheets <br /> Electrical Plans and Specifications: 10 sheets <br /> <br />Task 2 Deliverables: <br />· Draft Plans <br />· Draft Structural Calculations <br />· Draft Engineer’s Construction Cost Estimate <br />Electrical Design Services <br />Under Tasks 2 and 3, CSG’s electrical subconsultant, American Consulting Engineers Electrical (ACEE), will <br />perform electrical evaluation and design services to determine the adequacy of the existing scoreboard <br />electrical power supply and design the required electrical system upgrades required for the proposed <br />replacement scoreboards. ACEE will obtain a licensed electrician as required to determine the existing <br />power source. Due to the unique aspects of working with existing infrastructure and meeting current <br />codes and standards, CSG has attached ACEE’s detailed scope of electrical services as proposed for the <br />project. <br /> <br />Task 3 Final Design <br />After receiving City comments on the Task 2 submittal, CSG will address City comments and incorporate <br />or respond as appropriate. <br />Task 3 Deliverables: <br />· Final Plans <br />· Final Revised Calculations (if required) <br />· Final Engineer’s Construction Cost Estimate <br />171