My WebLink
|
Help
|
About
|
Sign Out
Home
9I Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 01182022
>
9I Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 10:34:16 AM
Creation date
4/1/2022 9:40:39 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Retention
PERM
Document Relationships
Reso 2022-019 CSA CSG Consultants Inc
(Amended)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 2 of 4 <br /> <br /> <br />Scope of Services <br />Task 1 Meetings and Coordination <br />Following a kick-off meeting with the City, CSG review available as-built plans as provided by the City and <br />will perform a site visit to clearly define identify site constraints that may impact the proposed structure <br />layout and design. Observations will be limited to exposed members that are not covered by vegetation. <br />CSG will review and coordinate sign layouts with the City as the design is developed. <br />Task 2 BallPark Scoreboard Structure Design <br />Following completion of the site review in Task 1, CSG will develop draft plans for the scoreboard location <br />layouts to be reviewed by the City Public Works Department staff, and other City staff as determined by <br />the City. <br />After the City approves the proposed scoreboard locations, the CSG Team will prepare the plans and <br />calculations. Specifications will be shown on the plan sheets. The design will adhere to the requirements <br />of the 2019 California Building Code (CBC) and will be stamped and signed by a California Licensed Civil <br />Engineer. Plan sheets are anticipated to include: <br /> <br /> Title Sheet: 1 sheet <br /> Site Layout Sheets: 3 sheets (one for each ballpark) <br /> Sign Foundation Details and Plan Based Specifications: 1-2 sheets <br /> Electrical Plans and Specifications: 10 sheets <br /> <br />Task 2 Deliverables: <br />· Draft Plans <br />· Draft Structural Calculations <br />· Draft Engineer’s Construction Cost Estimate <br />Electrical Design Services <br />Under Tasks 2 and 3, CSG’s electrical subconsultant, American Consulting Engineers Electrical (ACEE), will <br />perform electrical evaluation and design services to determine the adequacy of the existing scoreboard <br />electrical power supply and design the required electrical system upgrades required for the proposed <br />replacement scoreboards. ACEE will obtain a licensed electrician as required to determine the existing <br />power source. Due to the unique aspects of working with existing infrastructure and meeting current <br />codes and standards, CSG has attached ACEE’s detailed scope of electrical services as proposed for the <br />project. <br /> <br />Task 3 Final Design <br />After receiving City comments on the Task 2 submittal, CSG will address City comments and incorporate <br />or respond as appropriate. <br />Task 3 Deliverables: <br />· Final Plans <br />· Final Revised Calculations (if required) <br />· Final Engineer’s Construction Cost Estimate <br />171
The URL can be used to link to this page
Your browser does not support the video tag.