Laserfiche WebLink
December 8, 2021 <br />San Leandro Four (4) Ballpark Signs Replacement Project <br />Page 4 <br /> <br />S:\Proposals\PROPOSALS\CSG Consultant\San Leandro 4 Ballpark sign replacement_Proposal.doc <br />repeaters/extenders. ACEE proposes $15K (Design & CA) to provide, coordinate and <br />design power for proposed equipment. Design Service consist of: <br />▪ Provide and prepare panel schedule for 120V power connection. <br />▪ Provide and size cable. Outlet to be outdoor rated. <br />▪ Coordinate with landscape and City IT Representatives quantity and final location. <br />From our experience, some Cities like to mount on top of scoreboard. <br /> E. FEE OF SERVICES: <br />In consideration of the scope of basic services as outlined above, we proposed to provide the design <br />services on a Fee Basis noted. <br /> BASE SCOPE <br /> Engineer Site Survey & Coordination: $ 4,000.00 Fixed fee <br /> Site Electrician Support: $ 5,000.00 Fixed fee <br /> Construction Documents: $ 12,000.00 Fixed fee <br /> Construction Support Services: $ 2,220.00 Time & Material * <br /> Base Totals: $ 23,220.00 <br /> <br /> <br />* = Hours for Construction Support are assumptions made for budgeting and may require <br />additional fee if construction support hours are found to be insufficient during construction <br />phase. <br />Rate Schedule Assumed T&M for Construction Support <br />Project Principal $180/hr 2 $360 <br />Project Manager $170/hr 6 $1,020 <br />Project Engineer $140/hr 6 $840 <br /> $2,220 Total <br /> <br />Additional fees under exclusions will be added to the original fee if the owner requests our services. <br />Increases in the scope of subject work and/or revisions after our submission of substantially completed <br />documents or review of change orders not initiated by or as a result of this firm that results in additional work by <br />this firm will require negotiating fees. <br />The invoices shall be submitted monthly and are due and payable thirty (30) days from the date of receipt. <br />The duration of this contract shall be assumed to be 18 months. Should the project exceed this time frame, the <br />consultant’s compensation shall be equitably adjusted. <br />If the project is suspended or abandoned in whole or in part for more than twelve (12) months, the consultant <br />shall be compensated for all services performed prior to receipt of written notice from the client of such <br />suspension or abandonment, together with all reimbursable expenses then due and all Termination expenses as <br />specified in the termination notice. <br />If the project is resumed after being suspended for more than twelve months, the consultant’s compensation <br />shall be equitably adjusted. <br />We trust this is in agreement with your understanding of subject project and meets with your approval. Please <br />advice as soon as possible by signing and returning this letter to our office so we may proceed. This proposal is <br />valid for thirty (30) days. <br />repeaters/extenders. ACEE proposes $15K (Design & CA) to provide, coordinate and <br />design power for proposed equipment. Design Service consist of: <br />177