My WebLink
|
Help
|
About
|
Sign Out
Home
9I Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 01182022
>
9I Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 10:34:16 AM
Creation date
4/1/2022 9:40:39 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Retention
PERM
Document Relationships
Reso 2022-019 CSA CSG Consultants Inc
(Amended)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 8, 2021 <br />San Leandro Four (4) Ballpark Signs Replacement Project <br />Page 3 <br /> <br />S:\Proposals\PROPOSALS\CSG Consultant\San Leandro 4 Ballpark sign replacement_Proposal.doc <br />c. Wi-Fi System & Infrastructure (NOT in Scope): The scoreboard is wireless only to the <br />scoreboard control console. There is no network infrastructure to the City wireless network <br />system, <br />d. Data System (NOT in Scope): <br />e. Field Sound System (NOT in Scope): <br />f. Security Camera (NOT in Scope): <br /> 4. Rough Estimate @ DD (30%), 75%, 100% and Final: <br />a. Not in scope <br /> 5. Demolition of existing underground electrical scoreboard utilities (Base Scope): <br />a. Provide and adjust existing scoreboard branch circuits installed as needed to facilitate new <br />scoreboard replacement. <br /> <br /> B. CONSTRUCTION SERVICES: <br />1. Bid Process: <br />a. Provide and assist architect with bid process. <br />b. Respond to Pre-RFIs and clarifications. <br />c. Provide addendum as needed to facilitate bid documents. <br />2. Construction Support: <br />a. Review and respond to pre-construction issues/comments. <br />b. Review and respond to RFIs, Field Issues and Change orders. <br />c. Review and respond to electrical submittals and shop drawings. Review of contractor’s <br />submittals for compliance. <br />3. Construction Admin: <br />a. Provide a final site inspection and prepare punch list to the architect. <br />b. Review close-out documents and as-builts to ensure compliance with drawing documents. <br /> C. DELIVERABLES: <br />1. Drawings & Specifications: <br />a. Provide sets of design development (DD, 30%), 75% set for coordination, 100% final draft <br />and Final/Bid 100% drawings for final City submission & Approval/Bid. Copies of <br />approved/permitted will be Architect’s responsibility. Additional drawing sets requested <br />upon approval will be billed as a reimbursable expense. <br /> D. ADDITIONAL SCOPE OPTIONS: (If accepted, add to fee) <br />ADDITIONAL Fee: Additional Scope Option are additional Electrical Design Services added to our <br />BASE Design Fee for electrical work NOT included in base scope. <br />The following design will be ADDED to the base design drawings if owner request to include as part of <br />the Base Project. The scope option of work includes: <br />1. City Wi-Fi Coverage System: Provide 120V power for Wi-Fi city extenders/repeaters. It is <br />assumed existing Wi-Fi repeaters (data network source) are within City of San Leandro. <br />City IT to purchase/furnish repeater equipment. ACEE to provide power design for Wi-Fi <br />(If accepted, add to fee) <br />176
The URL can be used to link to this page
Your browser does not support the video tag.