My WebLink
|
Help
|
About
|
Sign Out
Home
9B Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 03212022
>
9B Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 11:36:09 AM
Creation date
4/1/2022 12:13:12 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Retention
PERM
Document Relationships
Reso 2022-044 CSG Consulting AMDT 2
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
Reso 2022-046 Accept work for Main Library and MCC Audio Visual Equipment
(Amended)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Consulting Services Agreement between City of San Leandro and CSG Consultants, Inc. <br />for Washington Avenue Reconstruction, Project No. 2018.4020 Exhibit A – Page 4 of 4 <br />City anticipates the plan sheet package to include, Title/General Notes/Key Map/Typical Sections, Existing <br />Condition & Horizontal Control Plan, Demolition Plan, Plan/Profile Plans, Construction Details, Signing and <br />Striping Plans and Signal Modifications on City-Furnished As-Built Plans. <br />The special provisions will be prepared in “GreenBook” format and in accordance with applicable City standards. <br />City shall provide the general provisions (“front end”), while the consultant shall provide the technical Section and <br />Part 6, the Temporary Traffic Control Section. Consultant shall also provide the bid items and quantities. <br /> <br />Deliverables <br />The following deliverables will be submitted to the City at each level of completion: <br />• Five sets of half size hardcopies and PDFs of the 50% and 100% plans <br />• PDFs of the technical Specifications and estimates <br />• Responses to City’s comments on 50% and 100% submittals <br />• Full size stamped and signed hardcopies of bid plans <br />• Electronic copies (in AutoCAD) of bid plans <br />• Electronic copies of technical specifications and estimates (in word and excel, respectively) <br /> Task F - Bidding Support Services <br />Consultant can assist the City during bidding to respond to Requests for Clarifications and prepare <br />Addendums, if needed. <br /> <br />Deliverables: <br />Responses to Requests for Clarifications; Addendum, if needed <br /> Schedule <br /> <br />Task Description Milestone <br />B Complete Topographic Survey 60 Days from Issuance of Notice to Proceed <br />C & D Submit Preliminary Design Report 90Days from Issuance of Notice to Proceed <br />E 50% Construction Documents 150Days from Issuance of Notice to Proceed <br />E 100% Construction Documents 45 Days from Receipt of City Comments on 50% <br />Submittal <br />E Final Bid Documents 15 Days from Receipt of City’s Comments on 100% <br />Submittal <br />F Bidding Support - Response to RFIs Within 3 Days of Request <br />DocuSign Envelope ID: 0B2194DA-BDFA-4849-A672-C694D69E193C
The URL can be used to link to this page
Your browser does not support the video tag.