My WebLink
|
Help
|
About
|
Sign Out
Home
9C Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 03212022
>
9C Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2022 12:13:28 PM
Creation date
4/1/2022 12:13:27 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Retention
PERM
Document Relationships
Reso 2022-045 Spencon Contract Change Order Annual Sidewalk Repair
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />Meeting Date: March 21, 2022 <br />Staff Report <br />Agenda Section:File Number:22-092 CONSENT CALENDAR <br />Agenda Number:9.c. <br />TO:City Council <br />FROM:Fran Robustelli <br />City Manager <br />BY:Keith Cooke <br />Engineering & Transportation Director <br />FINANCE REVIEW:Susan Hsieh <br />Finance Director <br />TITLE:Staff Report for a City of San Leandro City Council Resolution to Increase the <br />Contract Change Order Cap Authorization from 27% to 37% (from $316,705 to <br />$434,000; an Increase of $117,295) for the Original Construction Contract <br />Amount of $1,172,980 with Spencon Construction, Inc. for the Annual Sidewalk <br />Repair Program 2019-2020, Project No. 2019.0060 <br />SUMMARY AND RECOMMENDATIONS <br />The Annual Sidewalk Repair Program 2019-2020 project was awarded on November 18, 2019; <br />the construction work is complete and project closeout has started. This increased change order <br />authorization will allow payment for extra work performed by the contractor due to unexpected <br />conditions encountered during construction, as well as for the construction of improvements <br />added onto the project during the construction phase. <br />Staff recommends that the Council authorize an increase to the Contract Change Order (CCO) <br />cap from 27% to 37% (from $316,705 to $434,000, which is a Change Order Cap Increase of <br />$117,295) for the original contract amount of $1,172,980 with Spencon Construction, Inc. for the <br />subject project. <br />BACKGROUND <br />On November 18, 2019, the City Council awarded a construction contract to Spencon <br />Construction, Inc. for $1,172,980 for the subject project and authorized the City Manager to <br />approve contract change orders up to 27% of the total contract amount. This contract <br />reconstructed or installed 48,600 square feet of concrete sidewalks and driveways, 2,700 linear <br />feet of curb and gutter and 4,300 square feet of ADA accessible curb ramps at more than 400 <br />locations throughout the City. The majority of locations on the Sidewalk Repair Project have been <br />reported to the City by residents, workers, visitors, and other people that utilize the City’s <br />sidewalk network. They report hazards and damaged sidewalks through either directly contacting <br />City staff, or by using the MySL app or website. <br />Page 1 City of San Leandro Printed on 3/16/2022
The URL can be used to link to this page
Your browser does not support the video tag.