My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda Packet
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 03212022
>
Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2022 12:18:11 PM
Creation date
4/1/2022 12:15:08 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J.Plans shall conform to the currently adopted.codes and standards at time of <br />building permit submittal. <br />VIII. BUILDING AND SAFETY DIVISION REQUIREMENTS <br />A. The project shall comply with all applicable Building and Fire codes. Site and <br />Building plans shall be provided for review and approval prior to issuance of <br />building permits. <br />B. Compliance required with the City's green building programs and Build It Green's <br />protocols. <br />C. Dead end hallways or corridors are not permitted. Building permit plans shall <br />address this issue. <br />IX ENVIRONMENTAL SERVICES REQUIREMENTS <br />A. The storage of hazardous materials in quantities equal to or greater than 55 <br />gallons, 200 cubic feet or 500 pounds and generation of any amount of <br />hazardous waste requires submittal of a Hazardous Materials Business Plan <br />HMBP). HMBP submittal shall be completed via the California Environmental <br />Reporting System (CERS) online database at hftp://cers.calepa.ca.gov/. An <br />HMBP shall be submitted prior to issuance of a certificate of occupancy or <br />placement of the material onto the site, whichever occurs first. The plan is subject <br />to review and approval of Environmental Services. <br />B. Discharge of anything other than rainwater to the storm water collection system, <br />which includes area drains, sidewalks, parking areas, street curb and gutter, is <br />prohibited. <br />C. The generation or discharge of wastewaters, other than domestic sewage, may <br />require a pretreatment permit for discharge to the sanitary sewer. If a permit is <br />required, submittal of an application to the City's Environmental Services office is <br />required prior to a final building permit or commencing the discharge, whichever <br />occurs first. <br />D. Hazardous waste generated on site shall be handled and disposed pursuant to <br />applicable local, state, and federal law. Generators of hazardous waste must <br />register with the City's Environmental Services, which is the Certified Unified <br />Program Agency (CUPA), through CERS. <br />X POLICE DEPARTMENT REQUIREMENTS <br />A. High Resolution Cameras shall be placed on the exterior to monitor the entire <br />Agreement to Conditions November 2,2017 <br />PLN 17-0012 Page 10 of 14
The URL can be used to link to this page
Your browser does not support the video tag.