My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt to Conds 14655 Wicks Blvd 12012021
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2021
>
Agmt to Conds 14655 Wicks Blvd 12012021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2024 12:11:14 PM
Creation date
4/18/2022 9:40:53 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
12/1/2021
Recorded Document Type
Agreement to Conditions
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16. A Deferred Submittal, is required for the installation of an Underground Fire Line. <br />17. On -site fire hydrants maybe required. <br />18. A Deferred Submittal is required for the installation of Carbon monoxide system. <br />19. A mechanical ventilation system may be required for the vehicle work area. <br />20. Fire Extinguishers shall be provided per the code. <br />21. Emergency Lighting shall be provided with an average of 1-foot candle at the <br />floor along the means of egress route. <br />22. Illuminated exit signs shall be provided indicating the means of egress route. <br />23. All flammable/ combustible liquids, Hazardous materials, aerosols, and LPG <br />tanks shall be stored according to the CFC 2019 edition. <br />24. All parts cleaning stations shall be listed for use. <br />25. Information on all above ground tanks for oil and anti -freeze if used shall be <br />provided. <br />26. An address shall be provided that can be seen from the street and have a <br />contrasting background. <br />27. A Knox Box shall be provided for fire department access. <br />V. BUILDING & SAFETY SERVICES REQUIREMENTS <br />Please note that a formal plan check review will be completed at time of project <br />submittal to the Building Division. All required items listed below are to be addressed <br />prior to submitting to the Building and Safety Division for permits. <br />28. Geotechnical report and Geotech structural plans review approval letter. <br />29. FAA approval for any crane site work. <br />30. PCB Report must be done prior to demo of building. <br />31. Asbestos Report. <br />32. Approval from Bay Area Air Quality Management District BAAQMD J # for the <br />demolition of structures. <br />33. Lead Report. <br />34. Best practices for Lead removal. <br />35. All submittals shall include required mechanical, electrical, and plumbing plans. <br />No deferred MEP's (Mechanical Electrical Plumbing). <br />36. Title 24 required for all new equipment, and any new or upgraded MEP. <br />37. Construction and Demolition shell be as per CalGreen requirements. <br />38. CalGreen Non -Residential Mandatory Measures Checklist shall be provided. <br />39. Provide van and standard accessible parking space with signage and stripping. <br />Agreement to Conditions September 16, 2021 <br />PLN21-011 14655 Wicks Blvd. Page 6 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.