My WebLink
|
Help
|
About
|
Sign Out
Home
11A Public Hearings
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 05022022
>
11A Public Hearings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 4:06:05 PM
Creation date
5/10/2022 4:01:51 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/2/2022
Retention
PERM
Document Relationships
Ord 2022-005 PP Zoning Map Amendment Second Reading
(Approved by)
Path:
\City Clerk\City Council\Ordinances\2022
Reso 2022-068 PD SPR
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
Reso 2022-069 Tentative Map 2824 Halcyon Drive
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Exhibit A: Recommended Findings of Fact Page 5 of 8 <br />PLN21-0005: 2824 Halcyon Drive <br />project would be below thresholds of significance and project-specific impacts relative <br />to traffic hazards, emergency access, pedestrian and bicycle circulation, and transit <br />capacity would not exceed or differ from those identified in the General Plan EIR. In <br />addition, the project would not result in new specific effects that were not addressed in <br />the General Plan EIR, and no new mitigation measures would be required. The project <br />will connect the existing Elderberry Way and Muscari Court and will make a through <br />street which will have adequate capacity to safely and reasonably accommodate the <br />traffic generated by the development. In addition, there are AC Transit bus stops such <br />as Route 28 located near the intersection of Halcyon Drive and Oleander Street, Route <br />35 located near the intersection of Halcyon Drive and Hesperian Boulevard. These <br />routes are within half a mile from the project. Bay Fair BART Station is located within <br />one mile from the project. Several AC transit routes run through Bay Fair BART Station <br />such as Routes 40, 97, 10, 93, 35, and 28. <br /> <br />There are adequate public facilities in the area to serve this residential development. <br />There is adequate public service to the proposed subdivision, including but not limited <br />to gas and electric, the water district, the sanitary district, solid waste disposal and <br />recyclable materials collection services, cable television, schools, and police and fire <br />protection. The project will contribute both physical improvements and development <br />impact fees to the community. <br /> <br />5. The Planned Development Project Plan will provide superior urban design in <br />comparison with the development under the base district zoning regulations. <br /> <br />The site planning for the Planned Development allows for adequate front yard, side and <br />corner side yard and rear yard setbacks, attached garage parking and driveway parking <br />that maximize the concept of single-family homeownership. The heights, lot coverages, <br />and floor area ratios of the single-family houses do not exceed the maximum allowed in <br />the Residential Single-Family zoning district. In addition, the design of the project <br />contains architectural patterns and elements that contribute to the character of the <br />Planned Development, including the use of colors, exterior materials, and landscaping <br />for the areas contiguous to the street and through the project site. The overall design <br />and features included within Planned Development enhances the development’s long- <br />term livability and value retention in this new residential development. <br /> <br />6. The Planned Development Project includes adequate provisions for utilities, <br />services, and emergency vehicle access; and that public service demands will <br />not exceed the capacity of the existing and planned systems. <br /> <br />There is adequate public service provided to the proposed subdivision, including but not <br />limited to electric, water, waste disposal, and police and fire services. The Engineering <br />and Transportation Department and Fire Department have found the access to the site <br />to be safe for vehicular, pedestrian and emergency vehicle access. The project will <br />contribute both physical improvements and development impact fees to the community. <br /> <br />Site Plan Review Findings <br />
The URL can be used to link to this page
Your browser does not support the video tag.