226. The Applicant/Developer shall ensure that the area surrounding the project such as the streets stay <br />free and clear of construction debris such as silt, dirt, dust, and tracked mud coming in from or in <br />any way related to project construction. Areas that are exposed for extended periods shall be <br />watered regularlyto reduce wind erosion. Paved areas and access roads shall be swept on a regular <br />basis. All trucks carrying soil, silt, dirt, dust, debris, and other materials that may potentially <br />become airborne during transport shall be covered. <br />227. The Applicant/Developer shall submit a Conditional Letter of Map Revision based on Fill (CLOMR — <br />F) to Federal Emergency Management Agency (FEMA) for review and approval, prior to issuance <br />of the Floodplain Development Permit. The Applicant/Developer shall subsequently, apply for a <br />Letter of Map Revision based on Fill (LOMR-F) following construction of the site improvements <br />prior to issuance of the first Certificate of Occupancy. The LOMR-F shall be in substantial <br />compliance with the CLOMR-F. <br />228. A FEMA Elevation Certificate (most current version) based on plan drawings is required for all <br />developments located within the FEMA 100-year floodplain (currently Zone AE) as shown on the <br />most recent Flood Insurance Rate Map (FIRM) (current Panel Number 06001CO254H, dated <br />December 21, 2018). The 100-year Base Flood Elevation (BFE) is currently Elevation 10 feet, <br />NAVD88 Datum. The Applicant/Developer shall submit a second Elevation Certificate based on <br />completed construction for each structure prior to Building Permit Final and Certificate of <br />Occupancy for any structure. <br />AGREEMENTS, FEES, BONDS <br />229. All required faithful performance bonds and labor materials bonds in a penal amount equal to 100 <br />percent of the approved estimates of construction costs of improvements shall be submitted to and <br />approved by the City and other agencies having jurisdiction prior to issuance of any construction <br />permit. A Grading Permit may be issued without the other permits in place by posting an <br />appropriate Bond for grading. <br />230. The Applicant/Developer shall provide punch list items prepared by the City Construction Inspector <br />and Grading Inspector which shall serve as the only list and must be completed and signed off by <br />each inspector. All punch list items shall be completed priorto acceptance of improvements without <br />any carryover items to the warranty period. <br />231. The Applicant/Developer shall provide "As -built" plans for grading, improvements, streetlight, and <br />joint trench utilities prepared and certified by the subdivision engineer. All as -built plans must be <br />reviewed and signed by the City inspectors prior to submittal. Submit a finalized and signed set of <br />"As -built" plans electronically in PDF(Portable Document Format). <br />232. The Applicant/Developer shall pay all fees associated with the review and processing of all permits <br />including all Consultant review fees. <br />Recommended Conditions of Approval June 21, 2022 <br />PLN22-0008, PLN21-0020 & PLN21-0021 Page 39 of 39 <br />