My WebLink
|
Help
|
About
|
Sign Out
Home
11B Public Hearings
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 06212022
>
11B Public Hearings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2022 1:20:53 PM
Creation date
6/28/2022 1:00:14 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/21/2022
Retention
PERM
Document Relationships
Reso 2022-085 Approving Third Addendum and Planning Entitlements
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
Reso 2022-086 2nd amendment to DDA
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN LEANDRO SHORELINE DEVELOPMENT EIR ADDENDUM PROJECT <br />CITY OF SAN LEANDRO <br /> <br />May 2022 Page 13 <br />accessible vantage point). If the project is in an urbanized area, would the project conflict with <br />applicable zoning and other regulations governing scenic quality? <br />d) Create a new source of substantial light or glare which would adversely affect day or nighttime <br />views in the area? <br /> <br />Comments: <br />AES-a <br />As stated in the Certified EIR, the Original Project would alter the Significant View identified in the San <br />Leandro General Plan, which consists of near-field views of the existing marina, boats, docks, and other <br />marine-related activities through their removal, as well as, mid- to far-field views due to the inclusion of <br />two restaurants and the hotel on Mulford Point which would obstruct views of the horizon and of the <br />ridgeline of the Santa Cruz Mountains on the San Francisco Peninsula4. However, the Certified EIR found <br />that the project would result in a less than significant impact to scenic vistas. <br /> <br />As a key change of the First EIR Addendum, the hotel, was relocated 1,300 feet inland from Mulford <br />Point. The 8,000 square foot restaurant was eliminated, and the two-story 15,000 square foot conference <br />center was changed to the restaurant/banquet facility, and relocated 275 feet inland. Under the Modified <br />Project, the 17- and 5-foot height increase of the hotel building and restaurant/banquet hall, respectively, <br />would not block views of the horizon nor the mid - and far-field ridgeline views of the Santa Cruz <br />mountains, given the relocation of these buildings inland, and would not result in a new impact or a <br />substantial increase in magnitude of the existing impacts to scenic vistas. <br /> <br />The 13-foot height increase of the parking structure for the flats under the Modified Project reflects a 3- <br />foot increase in average roof height, a 5-foot increase in the height of the parapet wall, and an additional <br />5 feet for the stair well, elevator penthouse and corner parapets. With the integrated design of the <br />parking structure and flats, the elevator penthouse is the only element that rises above the building <br />roofline, compared to the Approved Project. The penthouse serves the elevator for the parking structure, <br />and is located in the center of the roof. The small area of the penthouse, would not obstruct views of the <br />horizon or mid- and far-field ridgeline views of the Santa Cruz mountains to any greater degree than the <br />Approved Project and, therefore, would not result in a new impact or a substantial increase in the <br />magnitude of the existing impacts to scenic vistas. <br /> <br />The eight-foot height increase for the townhomes under the Modified Project, is to allow for stair wells to <br />provide roof access to each unit. The stairwells occupy only a portion of the roof area and are set back <br />from the building façade. Therefore, the increased height would not obstruct views of the horizon or mid- <br />and far-field ridgeline views of the Santa Cruz mountains to any greater degree than the Approved Project <br />and would not result in a new impact or a substantial increase in the magnitude of the existing impacts to <br />scenic vistas. <br /> <br />AES-b <br />As with the Original Project, the Modified Project is not near a scenic highway and would therefore not <br />result in a new impact or a substantial increase in magnitude of an existing impact to scenic highways. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.