My WebLink
|
Help
|
About
|
Sign Out
Home
11B Public Hearings
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 06212022
>
11B Public Hearings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2022 1:20:53 PM
Creation date
6/28/2022 1:00:14 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/21/2022
Retention
PERM
Document Relationships
Reso 2022-085 Approving Third Addendum and Planning Entitlements
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
Reso 2022-086 2nd amendment to DDA
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN LEANDRO SHORELINE DEVELOPMENT EIR ADDENDUM PROJECT <br />CITY OF SAN LEANDRO <br /> <br />May 2022 Page 37 <br />4.10 HYDROLOGY AND WATER QUALITY <br />4.10.1 IMPACTS ASSOCIATED WITH THE MODIFIED PROJECT <br />Would the project: <br />Environmental Issues <br />Substantial <br />Change in <br />Project <br />Requiring <br />Major <br />EIR/MND <br />Revisions <br />Substantial <br />Change in <br />Circumstanc <br />es Requiring <br />Major <br />EIR/MND <br />Revisions <br />New <br />Information <br />Showing <br />New or <br />Increased <br />Significant <br />Effects <br />Less Than <br />Significant <br />Impacts/No <br />Changes or <br />New <br />Information <br />Requiring <br />Preparation <br />of a <br />Subsequent <br />EIR/MND No Impact <br />a) Violate any water quality <br />standards or waste discharge requirements <br />or otherwise substantially degrade surface <br />or ground water quality? <br /> x <br />b) Substantially decrease <br />groundwater supplies or interfere <br />substantially with groundwater recharge <br />such the project may impede sustainable <br />groundwater management of the basin? <br /> x <br />c) Substantially alter the existing <br />drainage pattern of the site or area, <br />including through the alteration of the <br />course of a stream or river or through the <br />addition of impervious surfaces, in a manner <br />which would: <br /> x <br />i) result in substantial <br />erosion or siltation on- or off-site; x <br />ii) substantially increase <br />the rate or amount of surface <br />runoff in a manner which would <br />result in flooding on- or offsite; <br /> x <br />iii) create or contribute <br />runoff water which would exceed <br />the capacity of existing or planned <br />stormwater drainage systems or <br />provide substantial additional <br />sources of polluted runoff; or; <br /> x <br />iv) impede or redirect flood <br />flows; x <br />d) In flood hazard, tsunami, or seiche <br />zones, risk release of pollutants due to <br />project inundation? <br /> x
The URL can be used to link to this page
Your browser does not support the video tag.