Laserfiche WebLink
SAN LEANDRO SHORELINE DEVELOPMENT EIR ADDENDUM PROJECT <br />CITY OF SAN LEANDRO <br /> <br />May 2022 Page 63 <br />4.19 UTILITIES AND SERVICE SYSTEMS <br />4.19.1 IMPACTS ASSOCIATED WITH THE MODIFIED PROJECT <br />Would the project: <br />Environmental Issues <br />Substantial <br />Change in <br />Project <br />Requiring <br />Major <br />EIR/MND <br />Revisions <br />Substantial <br />Change in <br />Circumstanc <br />es Requiring <br />Major <br />EIR/MND <br />Revisions <br />New <br />Information <br />Showing <br />New or <br />Increased <br />Significant <br />Effects <br />Less Than <br />Significant <br />Impacts/No <br />Changes or <br />New <br />Information <br />Requiring <br />Preparation <br />of a <br />Subsequent <br />EIR/MND No Impact <br />a) Require or result in the relocation <br />or construction of new or expanded water, <br />wastewater treatment or storm water <br />drainage, electric power, natural gas, or <br />telecommunications facilities, the <br />construction or relocation of which could <br />cause significant environmental effects? <br /> x <br />b) Have sufficient water supplies <br />available to serve the project and reasonably <br />foreseeable future development during <br />normal, dry and multiple dry years? <br /> x <br />c) Result in a determination by the <br />wastewater treatment provider which serves <br />or may serve the project that it has adequate <br />capacity to serve the project’s projected <br />demand in addition to the provider’s existing <br />commitments? <br /> x <br />d) Generate solid waste in excess of <br />State or local standards, or in excess of the <br />capacity of local infrastructure, or otherwise <br />impair the attainment of solid waste <br />reduction goals? <br /> x <br />e) Comply with federal, state, and <br />local management and reduction statutes <br />and regulations related to solid waste? <br /> x <br /> <br />