Contractor's Price Proposal - Detail Continues..
<br />Work Order Number: 099276.00
<br />Work Order Title: Monarch Bay Golf Course- Parking Lot
<br />Section - 01
<br />6 01 55 26 00 0649 MO Type II Barricade, Up To 3' Wide With Two Reflective Rails Each Side
<br />$48.19
<br />Quantity Unit Phce Factor
<br />Total
<br />Installation 200 x 2D34 x 11845 =
<br />48.19
<br />safety and traffic control - 2 each barricade at entran ces x 1 month
<br />9 01 55 26 000090 WK Mesh Or Vinyl Roll -up Sign With Stand
<br />$13030
<br />Quantity Unit Phce Factor
<br />Total
<br />Installation g 00 x 13.75 x 11845 =
<br />130.30
<br />Temp. traffic signage "Entrance Close" QTY2 for 4 weeks
<br />f0 01 55 26 00 0124 EA Place And Remove Up To 25C Canes By Hand From Roadside
<br />$57-45
<br />Quantity Unit Phce Factor
<br />Total
<br />Installation 2500 x 194 x 11845 =
<br />57A5
<br />safety and traffic control - 25 each temporary cones place and remove
<br />11 01 71 13 00 0004 EA First 25 Miles, Equipment Delivery, Pickup, Mobilization And Demobilization
<br />$13,877.03
<br />Using A Tractor Trailer With Up To 53' Bedlndudes loading, tie -down of
<br />equipment, delivery of equipment, off loading on site, rigging, dismantling,
<br />loading for return and transporting away. For equipment such as bulldozers,
<br />motor scrapers, hydraulic excavators, gradalls, road graders,
<br />loader-backhoes, heavy duty construction loaders, tractors, pavers, rollers,
<br />bridge finishers, straight mast construction forklifts, telescoping boom rough
<br />terrain construction forklifts, telescoping and articulating boom manlifts with
<br />40' boom lengths, etc.
<br />Quantity Unit Phce Factor
<br />Total
<br />Installation 16.00 x 732.22 x 1.1845 =
<br />13,877.03
<br />Equipment list (1) paving machine, (2) roller, (2) bobcat, (1) grinder, (1) mini -bobcat, (1)water truck = 8 each
<br />x 2 moves
<br />12 01 74 19 00 0016 EA 40 CY Dumpster (5 Ton) "Construction Debris"Includes delivery of dumpster,
<br />$793-58
<br />rental cost, pick-up cost, hauling, and disposal fee. Nan -hazardous material.
<br />Quantity Unit Phce Factor
<br />Total
<br />Installation 1.00 x 669.97 x 1.1845 -
<br />793.58
<br />for disposal of general construction debris
<br />13 01 74 19 00 0017 EA 10 CY Law -Boy Dumpster "Concrete Or Asphalt Only"Includes delivery of
<br />$79358
<br />dumpster, rental cost, pick-up cost, hauling, and disposal fee. Concrete or
<br />asphalt only.
<br />Quantity Unit Phce Factor
<br />Total
<br />Installation 100 x 669.97 x 11845 =
<br />793.58
<br />for disposal of demolished concrete pavement (240 S F x 4112 - 27 = 3 CY x 1.4 bulk factor
<br />= 1 load)
<br />14 01 74 19 00 0617 EA 10 CY Law -Boy Dumpster "Concrete Or Asphalt Only"Includes delivery of
<br />$25,394.54
<br />dumpster, rental cost, pick-up cast, hauling, and disposal fee. Concrete or
<br />asphalt only.
<br />Quantity Unit Phce Factor
<br />Total
<br />Installation 32.00 x 669.97 x 1.1845 =
<br />25,394.54
<br />for disposal of demolished 4" asphattat parking lot [10600 SF x 4f12 - 27 = 131 CY + driving range 131D0 SF
<br />x3M2 = 27 = 121 CY, total asphalt = 252 CY x 1.25 bul k factor = 32 loads
<br />15 01 74 19 00 0021 MO Rampless Concrete Washout Binlncludes delivery.
<br />$545-36
<br />Quantity Unit Phce Factor
<br />Total
<br />Installation 1 00 x 460.41 x 11845 =
<br />545.36
<br />fresh concrete washout bin
<br />Contractor's Price Proposal - Detail
<br />Page 2 of 9
<br />4118f2022
<br />Non -Professional Services Agreement between
<br />June 6, 2022
<br />City of San Leandro and Angeles Contractor, Inc. — Exhibit A
<br />Page 5 of 12