Laserfiche WebLink
Contractor's Price Proposal - Detail Continues.. <br />Work Order Number: 099276.00 <br />Work Order Title: Monarch Bay Golf Course- Parking Lot <br />Section - 01 <br />6 01 55 26 00 0649 MO Type II Barricade, Up To 3' Wide With Two Reflective Rails Each Side <br />$48.19 <br />Quantity Unit Phce Factor <br />Total <br />Installation 200 x 2D34 x 11845 = <br />48.19 <br />safety and traffic control - 2 each barricade at entran ces x 1 month <br />9 01 55 26 000090 WK Mesh Or Vinyl Roll -up Sign With Stand <br />$13030 <br />Quantity Unit Phce Factor <br />Total <br />Installation g 00 x 13.75 x 11845 = <br />130.30 <br />Temp. traffic signage "Entrance Close" QTY2 for 4 weeks <br />f0 01 55 26 00 0124 EA Place And Remove Up To 25C Canes By Hand From Roadside <br />$57-45 <br />Quantity Unit Phce Factor <br />Total <br />Installation 2500 x 194 x 11845 = <br />57A5 <br />safety and traffic control - 25 each temporary cones place and remove <br />11 01 71 13 00 0004 EA First 25 Miles, Equipment Delivery, Pickup, Mobilization And Demobilization <br />$13,877.03 <br />Using A Tractor Trailer With Up To 53' Bedlndudes loading, tie -down of <br />equipment, delivery of equipment, off loading on site, rigging, dismantling, <br />loading for return and transporting away. For equipment such as bulldozers, <br />motor scrapers, hydraulic excavators, gradalls, road graders, <br />loader-backhoes, heavy duty construction loaders, tractors, pavers, rollers, <br />bridge finishers, straight mast construction forklifts, telescoping boom rough <br />terrain construction forklifts, telescoping and articulating boom manlifts with <br />40' boom lengths, etc. <br />Quantity Unit Phce Factor <br />Total <br />Installation 16.00 x 732.22 x 1.1845 = <br />13,877.03 <br />Equipment list (1) paving machine, (2) roller, (2) bobcat, (1) grinder, (1) mini -bobcat, (1)water truck = 8 each <br />x 2 moves <br />12 01 74 19 00 0016 EA 40 CY Dumpster (5 Ton) "Construction Debris"Includes delivery of dumpster, <br />$793-58 <br />rental cost, pick-up cost, hauling, and disposal fee. Nan -hazardous material. <br />Quantity Unit Phce Factor <br />Total <br />Installation 1.00 x 669.97 x 1.1845 - <br />793.58 <br />for disposal of general construction debris <br />13 01 74 19 00 0017 EA 10 CY Law -Boy Dumpster "Concrete Or Asphalt Only"Includes delivery of <br />$79358 <br />dumpster, rental cost, pick-up cost, hauling, and disposal fee. Concrete or <br />asphalt only. <br />Quantity Unit Phce Factor <br />Total <br />Installation 100 x 669.97 x 11845 = <br />793.58 <br />for disposal of demolished concrete pavement (240 S F x 4112 - 27 = 3 CY x 1.4 bulk factor <br />= 1 load) <br />14 01 74 19 00 0617 EA 10 CY Law -Boy Dumpster "Concrete Or Asphalt Only"Includes delivery of <br />$25,394.54 <br />dumpster, rental cost, pick-up cast, hauling, and disposal fee. Concrete or <br />asphalt only. <br />Quantity Unit Phce Factor <br />Total <br />Installation 32.00 x 669.97 x 1.1845 = <br />25,394.54 <br />for disposal of demolished 4" asphattat parking lot [10600 SF x 4f12 - 27 = 131 CY + driving range 131D0 SF <br />x3M2 = 27 = 121 CY, total asphalt = 252 CY x 1.25 bul k factor = 32 loads <br />15 01 74 19 00 0021 MO Rampless Concrete Washout Binlncludes delivery. <br />$545-36 <br />Quantity Unit Phce Factor <br />Total <br />Installation 1 00 x 460.41 x 11845 = <br />545.36 <br />fresh concrete washout bin <br />Contractor's Price Proposal - Detail <br />Page 2 of 9 <br />4118f2022 <br />Non -Professional Services Agreement between <br />June 6, 2022 <br />City of San Leandro and Angeles Contractor, Inc. — Exhibit A <br />Page 5 of 12 <br />