My WebLink
|
Help
|
About
|
Sign Out
Home
9T Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 06212022
>
9T Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2022 4:02:50 PM
Creation date
6/28/2022 1:22:06 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/21/2022
Retention
PERM
Document Relationships
Reso 2022-102 Angeles Contractor CSA
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor's Price Proposal - detail Continues <br />Work Order Number: 099276-00 <br />Work Order Title: Monarch Bay Golf Course - Parking Lot <br />Section - 01 <br />16 01 74 19 00 0024 <br />EA Vacuum, Pickup, SwapAnd Dump, Concrete Washout Binlncludes vacuum the <br />$879A1 <br />liquid from the full bin and pick up the bin, and recycle all material. An empty <br />bin will be left at the site d the project is not completed. <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 1 W x 742.43 x <br />1.1845 = <br />879A1 <br />fresh concrete washout tin <br />Subtotal for Section - 01 <br />$117.654.99 <br />Section - 02 <br />17 02 41 19 13 D059 <br />LF Saw Cut Bituminous Paving Up To 4" Depth <br />$4,864.61 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 2.26900 x 1.81 x <br />1.1845 = <br />4,864.61 <br />saw cut asphalt at edges and concrete transition for 4" R+R areas [13351 <br />and valley gutter <br />[92'+375 = <br />46Tx2sides--J.34'J, total of 2269 LF <br />f6 02 41 19 13 0336 <br />SF 4" Thick Reinforced Concrete Slab On Grade Cutouts, �24 SF <br />$998_53 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 20-00 x 42.15 x <br />1.1845 = <br />998.53 <br />remove existing concrete slab at shed area for new trench drain <br />19 02 90 50 00 0367 <br />BOX Dust Mask <br />$332.89 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation g OD x 35.13 x <br />1.1845 = <br />332.89 <br />OSHA, City and County health guidelines related to COVID-19 <br />protocok Dust mask <br />20 02 90 50 00 0369 <br />BOX Gloves - Latex <br />$154.93 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation g 00 x 16.35 x <br />1.1845 — <br />154.93 <br />OSHA, City and County health guidelines related to COVID-19 <br />Protocol- Glove <br />21 02 90 50 000406 <br />GAL DisinfectanVAntimicmbial <br />$408.04 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 403 x 86.12 x <br />11945 = <br />408.04 <br />OSHA, City and County health guidelines related to COVID-19 <br />protocol- Disinfectant <br />22 0290 50 000434 <br />OT Hand San itizer <br />g4326 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation d 00 x 913 x <br />11845 = <br />4326 <br />OSHA, City and County health guidelines related to COVID-19 <br />protocol- Hand Sanitizer <br />Subtotal for Section - 02 <br />$6,802.26 <br />Section - 03 <br />23 03 11 13 00 0010 <br />LF -6" To 12" High Slab Edge and Block -Out Wand Formwork <br />$1,440.66 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 17400 x (3.99 x <br />1 1845 = <br />1,440.66 <br />concrete forms for curb ramp [1501 and shed slab repair [241 <br />24 03 21 11 00 0128 <br />LF #4, Grade 60, Slab On Grade, Steel Reinforcement Bar <br />$648.87 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 660.00 x 0.83 x <br />1.1845 = <br />648.87 <br />install #4 rebars to the ADA curb ramp [W] and shed concrete slab repair <br />for trench drain <br />[20'] <br />Contractor's Price Proposal - Detail <br />'age 3 of 9 <br />4l18±2022 <br />Non -Professional Services Agreement between June 6, 2022 <br />City of San Leandro and Angeles Contractor, Inc. — Exhibit A Page 6 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.