My WebLink
|
Help
|
About
|
Sign Out
Home
9T Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 06212022
>
9T Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2022 4:02:50 PM
Creation date
6/28/2022 1:22:06 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/21/2022
Retention
PERM
Document Relationships
Reso 2022-102 Angeles Contractor CSA
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor's Price Proposal - detail Continues.. <br />Work Order Number: <br />099276-01) <br />Work Order Title: <br />Monarch Bay Goff Course - Parking Lot <br />Section - 03 <br />25 03 21 11 00 0251 <br />EA Dowels Or Hairpin, 112" x 30" Length, Dri lied And Epoxy In Concrete, 6" <br />$474.04 <br />Embedment <br />Quantity Unit Price <br />Factor <br />Total <br />In stall ation 20 00 x 23.01 x <br />11845 = <br />474.04 <br />dowels to existing slab joint to new slab at shed area trench drain <br />26 03 35 13 00 0004 <br />SF Broom, Concrete Floor Finish <br />$826 31 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 640 0D x 11.09 x <br />11845 = <br />826.31 <br />concrete finish at ADA curb ramp <br />27 03 35 13 00 0005 <br />SF Steel Trowel, Concrete Floor Finish <br />$33.88 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 20.0D x 1.43 x <br />1.1845 - <br />33.88 <br />concrete finish at shed area <br />26 03 37 16 000010 <br />HR 35 CYIHI, 66 HP Trailer Mounted Concrete Pumpincludes hoses <br />$1,747.75 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 1200.x 122.96 x <br />1.1845 - <br />1,747.75 <br />concrete pours approx. 3 separate visits x 4 hrs <br />Subtotal for Section -03 <br />$5,171.51 <br />Section -10 <br />29 10 14 53 11OD20 <br />EA 12"x24"AluminurnEngineer6radeTraffcSign <br />$691.08 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 11.00 x 53.04 x <br />1.1845 = <br />691.0E <br />Handicap sign <br />30 10 14 53 11 OD20 <br />0207 MOD For Hi -Intensity Grade, Add <br />$75.57 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 10-OD x 6.38 x <br />1.1845 <br />75.57 <br />31 10 14 53 11 0203 <br />EA 10'. 2-318" Diameter, Galvanized Steel Tubular Sign Post <br />$1,654.10 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 11.00 x 126.95 x <br />1.1845 = <br />1,554.10 <br />Handcap sign posts <br />32 10 14 53 11 0250 <br />EA 2-318" Outside Diameter, Double Sign Bracket Set <br />$560.14 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 1100 x 42.99 x <br />1.1845 - <br />%014 <br />Handicap sign bracket <br />Subtotal for Section -10 <br />$2,980.89 <br />Section - 22 <br />33 22 13 16 00 0004 <br />LF 3" underground Bell And Spigot Cast Iran Soil Pipe Assemblyincludes all <br />$1,321.90 <br />fittings and gaskets. Excludes earthwork excavation, backfll and compaction. <br />Not for use where detai I is available. <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 30.OD x 37.20 x <br />1.1845 = <br />1.321.90 <br />Bali washing station drainage work <br />Subtotal for Section -22 <br />$1,321.90 <br />Section - 31 <br />Contractor's Price Proposal - Detail <br />Page 4 of 9 <br />4118f2022 <br />Non -Professional Services Agreement between <br />June 6, 2022 <br />City of San Leandro <br />and Angeles Contractor, Inc. - Exhibit A <br />Page 7 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.