My WebLink
|
Help
|
About
|
Sign Out
Home
MO 2002-055 to 2002-060
CityHall
>
City Clerk
>
City Council
>
Minute Orders
>
2002
>
MO 2002-055 to 2002-060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 12:14:38 PM
Creation date
7/12/2022 11:51:53 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Minute Order
Document Date (6)
12/31/2002
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Street between I-880 Northbound Ramp to Doolittle Drive, to be <br />reviewed and approved by the City and Caltrans. The costs for the <br />preparation and implementation of the Signal Timing Plan shall be <br />fully borne by the Subdivider. Implementation of the Signal Timing <br />Plan shall be completed prior to issuance of the first certificate of <br />occupancy for the development. <br />C. The Traffic Study indicates that four (4) percent of the project's <br />traffic would use the proposed connection of Eden road between <br />Davis and Doolittle (Eden Road Project). Therefore, Subdivider <br />shall pay four (4) percent (fair share) contribution for the estimated <br />construction costs of acquisition of property and construction of <br />Eden Road between Doolittle Drive and Davis Street. The <br />preliminary construction cost estimated for Eden Road prepared by <br />Engineering and Transportation Department dated February 4, 2002 <br />is approximately $5.0 million. The project cost estimate shall be <br />adjusted based on Engineering News Record (ENR), Construction <br />Cost Index considering First Quarter 2002, as base year with index <br />value of 6501.69 published in ENR. The pro-rata share of costs for <br />each lot based on square footage (considering 8 lots total) shall be <br />assessed at such time as the City has established the funding of the <br />balance of the Eden Road Project cost through an assessment district <br />or other such public improvement financing vehicle. Each of the 8 <br />lots will contain an affirmative covenant agreeing to the <br />establishment of such an assessment district or other such financing <br />vehicle if established. <br />d. The Traffic Study recommending addition of westbound left turn <br />lane to provide access to the site. This will require striping <br />modifications or other improvements necessary on Davis Street to <br />accommodate addition of the left turn lane. All of these <br />improvements shall be constructed or must be included in the <br />Subdivision Improvements Agreement prior to the Final Map. <br />e. Developer shall contribute to LINKS program (shuttle bus) <br />administered by the San Leandro Transit Management Organization. <br />The contribution amount, year when annual payment commences, <br />and terms of payment shall be determined by mutual agreement <br />between the developer and the City of San Leandro prior to approval <br />of the Final Map. <br />C. STORtiI DRAINAGE <br />1. All storm water run-off from the project shall be collected in an underground <br />system and conveyed to an appropriate storm drain system. Hydrologic and <br />Revised Recommended Conditions of Approval <br />PLN2002-00031 Bayside Business Park <br />November 4, 2002 <br />Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.