My WebLink
|
Help
|
About
|
Sign Out
Home
MO 2002-055 to 2002-060
CityHall
>
City Clerk
>
City Council
>
Minute Orders
>
2002
>
MO 2002-055 to 2002-060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 12:14:38 PM
Creation date
7/12/2022 11:51:53 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Minute Order
Document Date (6)
12/31/2002
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
hydraulic calculations shall also be reviewed and approved by the City and <br />Alameda County Public Works Agency. <br />2. The Sub -divider shall make necessary payments to Alameda County Public Works <br />Agency for their review of the drainage their facilities. <br />3. The subdivision shall be graded to allow for the overland release of run-off into <br />Davis Street during a higher than design storm event and/or in the event of total <br />failure of the on -site storm drainage system. <br />4. The Developer is proposing to drain storm water run-off from the southern portion <br />of the site to forty-two (42) inch Alameda County Storm Drain line. Historical <br />evidence indicates deficiencies in the storm drain system, which are problematic <br />during high tides and rare stones. Therefore, the Developer's engineer shall <br />calculate the capacity of the downstream facility, so that City Engineer may <br />ascertain its ability to accept additional flow. The hydrologic and hydraulic <br />analysis shall include all the properties upstream, which drains into this 42-inch <br />storm line. Because the storm drain facility is owned by Alameda County Public <br />Works Agency, the Developer shall also provide evidence of the Agency's <br />acceptance of the additional flow. A minimum freeboard of twelve (12) inches <br />from the hydraulic Grade Line to the gutter flow lines must be maintained at all <br />times during the design storm. <br />D. GRADING EROSION AND POST -CONSTRUCTION CONTROLS <br />1. Prior to any grading operations, Developer shall submit all information including <br />a Grading Plan accompanied by Soils Engineering and Engineering Geology <br />Reports, in accordance with requirements of the City of San Leandro Municipal <br />Code Title VII, Chapter 12 and obtain a grading permit. <br />2. To control storm water pollution, the Developer shall comply with the regulations <br />and provisions contained in the City's Grading Ordinance, the City's Storm Water <br />Pollution Prevention Permit, and the National Pollutant Discharge Elimination <br />System (NPDES) to the satisfaction of the City Engineer. <br />3. Until such time as all construction for the development has been completed to the <br />satisfaction of the City Engineer, the Sub -divider shall provide current Erosion & <br />Sediment Control Plans and amended Storm Water Pollution Prevention Plans <br />(SWPPP's) for all portions of the site where construction is on -going. Said Plans <br />shall be submitted to the City Engineer for review and approval on or before <br />September 1, of each calendar year, and shall be fully implemented on or before <br />October 15, of each calendar year. <br />4. During construction the following high standards for sanitation are required: <br />Garbage cans, construction dumpsters, and debris piles shall be removed on a <br />Revised Recommended Conditions of Approval <br />PLN2002-00031 Bayside Business Park <br />November 4, 2002 <br />Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.